The state has started environmental review of rules that would turn voluntary water measures into requirements for new warehouses, offices and stores from Jan. 1, 2029. Comments are due Nov. 19.
California’s 2028 CALGreen water rules would require every new nonresidential building, from warehouses to offices and stores, to include at least one water-saving system, such as nonwater urinals, rainwater catchment or recycled water piping. The rules would take effect Jan. 1, 2029, and comments on the state’s environmental review are due Nov. 19, 2026.
Key takeaways
- The California Building Standards Commission filed a notice of preparation on Oct. 20, 2026 for an environmental impact report on 2028 CALGreen amendments under SB 745, the Drought-Resistant Buildings Act of 2023.
- The amendments would make certain voluntary water-efficiency measures mandatory in new nonresidential buildings. The 2028 CALGreen code is scheduled for publication July 1, 2028 and would take effect Jan. 1, 2029.
- Under the commission’s latest draft, dated Sept. 3, 2026, each new building would choose one of seven options, from nonwater urinals and rainwater catchment to recycled water and graywater systems.
- Projects would be exempt if every option is infeasible, for example if costs exceed 10% of total project cost. The commission is asking whether that threshold should be 5%.
- The commission’s draft cost figures put a nonwater urinal at about $850 installed, versus about $1,450 for a flushing urinal, and a commercial rainwater system at $8,000 to more than $50,000.
- A virtual scoping meeting is set for Nov. 12 at 10 a.m., and written comments are due by 5 p.m. Nov. 19, 2026.
2028 CALGreen water rules at a glance
| Item | Detail |
|---|---|
| Agency | California Building Standards Commission |
| Law behind it | SB 745, the Drought-Resistant Buildings Act (2023) |
| Applies to | Newly constructed nonresidential buildings, statewide |
| Requirement | At least one of seven water-saving options (indoor or outdoor) |
| Code edition | 2028 CALGreen (Title 24, Part 11), published July 1, 2028 |
| Effective | Jan. 1, 2029 |
| Environmental review | Notice of preparation filed Oct. 20, 2026 (SCH 2026100697) |
| Scoping meeting | Nov. 12, 2026, 10 a.m., virtual |
| Comments due | 5 p.m. Nov. 19, 2026, to environmental@dgs.ca.gov |
What would the 2028 CALGreen water rules require?
Each new nonresidential building would have to include at least one approved water-saving system. The commission’s notice of preparation says the amendments would “reduce potable water use in new nonresidential buildings by elevating certain existing voluntary water-efficiency measures to mandatory requirements,” with “multiple compliance options to accommodate varying building types and regional conditions throughout California.”
The commission’s latest draft standards, dated Sept. 3, 2026, spell out the options. A new nonresidential building would have to include one of these:
- Indoor options: nonwater urinals, required for every urinal where a project has four or more; an indoor recycled water system where a municipal source delivers disinfected tertiary recycled water to the site, or dual piping where it will in the future; or an on-site system that treats nonpotable water for toilet flushing and similar uses, or dual piping for one planned later.
- Outdoor options: a recycled water system for irrigation where municipal recycled water is available; a rainwater catchment system for irrigation; an on-site treated nonpotable water system for irrigation; or a simple or complex graywater system that reuses water from showers, sinks and laundry for irrigation.
The latest draft lowered the urinal trigger from 10 urinals to four, which the commission said makes the option fit a wide range of projects. It also dropped an option to pre-plumb for future outdoor recycled water.
Which buildings would the rules cover, and when?
The draft covers newly constructed nonresidential buildings, including warehouses, manufacturing buildings, offices, retail and most other commercial construction. The rules apply statewide, and the CEQAnet listing includes Kern County, Bakersfield and the county’s other cities.
If adopted, the amendments go into the 2028 CALGreen code, scheduled for publication July 1, 2028 and effective Jan. 1, 2029. Building codes generally apply to projects that apply for permits under the new edition, so buildings permitted under the current code would not be covered.
What exceptions does the draft include?
The Sept. 3 draft lists three. A project is exempt if its public water system already uses water from a direct or indirect potable reuse project. It is exempt if local building standards already require one of the listed systems. And it is exempt if the design team shows, and the local building official agrees, that every option is infeasible.
Reasons for infeasibility include costs above 10% of total project cost, no rainwater, graywater or recycled water available at the site, and physical site limits. The building official can accept others. The commission said it is seeking more input on the 10% figure because earlier comments suggested 5%.
What would the 2028 CALGreen water rules cost?
The commission has not set a dollar figure for a typical business. Its draft economic attachment says costs depend on which option a project chooses. It cited these examples:
- A nonwater urinal costs about $850 installed, compared with about $1,450 for a flushing urinal, but carries about $195 a year in cartridge or sealant maintenance. The plumbing code still requires a water line rough-in to each unit.
- A commercial rainwater harvesting system runs from about $8,000 to more than $50,000.
- Dual plumbing for recycled water in a 260,000-square-foot office building in Austin, Texas cost about $0.56 per square foot.
- An on-site graywater system in an 838,000-square-foot state office building cost about $0.36 per square foot.
The commission noted those examples are not representative of every project. It also said the rules would raise the cost to build and operate commercial buildings in the short term while reducing potable water demand over time.
How can owners and developers comment?
The notice of preparation opens a 30-day comment period on what the environmental impact report should study. A virtual scoping meeting is set for Nov. 12, 2026 at 10 a.m. on Microsoft Teams, with phone access at 949-266-9993, conference ID 418 454 518#.
Written comments are due by 5 p.m. Nov. 19, 2026. Email them to environmental@dgs.ca.gov with “Amendments to the 2028 California Green Building Standards Project” in the subject line, or mail them to the Department of General Services, Attn: Senior Environmental Planner, 107 3rd Street, 4th Floor, West Sacramento, CA 95605. The commission posts its draft standards and workshop materials on its SB 745 pre-cycle page.
After scoping, the commission will release a draft EIR for public review and then take up the standards as part of the 2028 code adoption.
What do the 2028 CALGreen water rules mean for Kern County owners and developers?
For a typical warehouse, the cheapest path will often be nonwater urinals, if the building has four or more urinals. Smaller industrial buildings with fewer urinals would look at rainwater catchment or graywater for landscape irrigation. The recycled water options only work where a city delivers tertiary recycled water to the site. In a dry climate like the southern San Joaquin Valley’s, some projects may qualify for the infeasibility exception, but that takes documentation and the building official’s sign-off.
Timing matters for projects already approved. Large Kern projects such as the Airport Commerce Center near Meadows Field and future sites like the Rosedale Ranch megasite would fall under the new rules only if their building permits come under the 2028 code. Developers planning spec or build-to-suit buildings for 2029 and later should carry the cost in their budgets now. Kern CRE’s build-to-suit versus spec development guide explains how those budgets work.
Tenants face the operating side. Nonwater urinals and on-site water systems carry ongoing maintenance, and under a triple-net lease that cost usually passes through to the tenant. Kern CRE’s explainer on operating expense pass-throughs shows how those charges work.
Frequently asked questions
What are the 2028 CALGreen water rules?
Proposed amendments to California’s green building code, CALGreen, that would require each new nonresidential building to include at least one water-saving system. They respond to SB 745, the Drought-Resistant Buildings Act of 2023.
When would the 2028 CALGreen water rules take effect?
Jan. 1, 2029, if the amendments are adopted. The 2028 CALGreen code is scheduled for publication July 1, 2028.
Do the rules apply to warehouses and industrial buildings?
Yes. The draft applies to newly constructed nonresidential buildings, which includes warehouses, manufacturing buildings, offices and retail.
What are the compliance options?
The Sept. 3, 2026 draft lists seven: nonwater urinals where a project has four or more urinals, indoor recycled water, on-site treated nonpotable water for indoor use, outdoor recycled water, rainwater catchment, on-site treated water for irrigation and graywater irrigation. A project needs only one.
Is there an exception if none of the options work?
Yes. A project is exempt if every option is shown to be infeasible and the local building official agrees, for example if costs exceed 10% of total project cost or no alternate water source is available. The commission is asking whether the cost threshold should be 5%.
How do I comment on the 2028 CALGreen water rules?
Join the virtual scoping meeting on Nov. 12, 2026 at 10 a.m., or email written comments to environmental@dgs.ca.gov by 5 p.m. Nov. 19, 2026 with “Amendments to the 2028 California Green Building Standards Project” in the subject line.
Planning a new warehouse, build-to-suit or industrial purchase in Kern County and want to know how code changes affect the budget and timing? Call Kern CRE at 855-KERN-CRE (855-537-6273) or contact us.
Get Kern County CRE news monthly: subscribe to the Kern CRE report.
Sources
- 2028 Amendments to the California Green Building Standards Code Pursuant to Senate Bill 745 (SCH 2026100697), California Governor’s Office of Land Use and Climate Innovation (CEQAnet), received Oct. 20, 2026.
- Notice of Preparation of a Draft Environmental Impact Report for 2028 Amendments to CALGreen Pursuant to SB 745, California Building Standards Commission, Oct. 20, 2026.
- SB 745 Draft Nonresidential Building Standards, California Building Standards Commission, Sept. 3, 2026.
- Economic and Fiscal Impact Statement Attachment, SB 745 Regulations (draft), California Building Standards Commission, Sept. 3, 2026.
- 2027 Triennial Cycle pre-cycle activities: SB 745 Nonresidential workshops, California Building Standards Commission, accessed Oct. 23, 2026.
About this article
Kern CRE prepared this article with help from AI research and writing tools. An editor reviewed the draft, checked its facts against the sources linked above and edited it for accuracy and clarity. It is general information, not legal, tax, investment or financial advice; talk with a qualified professional about your situation.

