A Southern California steel fabricator gets county approval to double its warehouse on a 20.7-acre industrial parcel north of Seventh Standard Road.
The Anvil Steel Shafter warehouse expansion will double Anvil Steel Corporation’s warehouse at 31127 Coberly Road, north of Seventh Standard Road, from 33,680 to 67,360 square feet. It also adds storage structures on a 20.7-acre industrial parcel in unincorporated Kern County, California. The Kern County Planning and Natural Resources Department approved the change on Aug. 6, 2026. The State Clearinghouse posted the county’s Notice of Determination on Aug. 14.
Key takeaways
- Kern County approved Modification No. 3 to Precise Development Plan 37, Map 79, on Aug. 6, 2026. It lets Anvil Steel double its Coberly Road warehouse from 33,680 to 67,360 square feet.
- The approval also covers a 1,250-square-foot attached storage structure, a 1,008-square-foot storage building and the conversion of an existing truck dock to a storage building on the parcel (Assessor’s Parcel Number 090-340-37).
- The state posted the county’s Notice of Determination on Aug. 14, 2026, under State Clearinghouse number 2004121109. That is the file number of a 2004 general plan amendment and zone change covering about 21 acres of industrial land on Coberly Road.
- Anvil Steel, founded in Gardena in 1973 and bought by president Paul Schifino in 1996, reports three fabrication plants, more than 400 employees and 35,000 tons of annual output.
- A national brokerage report counted one industrial building under construction in Bakersfield’s 67.4 million-square-foot market in Q2 2026, with availability at 10.1%.
Project at a glance
| Item | Detail |
|---|---|
| Project | Modification No. 3, Precise Development Plan 37, Map 79 |
| Location | 31127 Coberly Road, south side of the road, north of Seventh Standard Road, about 500 feet east of Enos Lane, unincorporated Shafter area |
| Parcel | APN 090-340-37; 20.7 acres; Section 35, T28S, R25E |
| Applicant and owner | Anvil Steel Corporation (Paul Schifino, president); filed through architect Michael Dhanens |
| Jurisdiction | Kern County Planning and Natural Resources Department |
| Case numbers | PDP 37, Map 79, Modification No. 3; SCH 2004121109; prior approval Notice of Decision No. 82-08 (Aug. 7, 2008) |
| Size | Warehouse from 33,680 to 67,360 SF; 1,250 SF attached storage structure; 1,008 SF storage building; existing truck dock converted to a storage building |
| Zoning and use | M-2 PD (Medium Industrial, Precise Development Combining District); warehouse and storage |
| Environmental review | Previously adopted Mitigated Negative Declaration; mitigation measures made conditions of approval |
| Status | Approved Aug. 6, 2026; Notice of Determination posted Aug. 14, 2026 |
| Next step | Building permits and construction; no schedule published |
What did Kern County approve for Anvil Steel?
Kern County approved Modification No. 3 to Precise Development Plan 37, Map 79, on Aug. 6, 2026. The county’s Planning and Natural Resources Department made the decision, not the Planning Commission or the Board of Supervisors. The Notice of Determination lists the request as “Anvil Steel by Michael Dhanens,” the project architect, with Schifino as the company contact.
The approved scope, as written in the county’s filing:
- Warehouse: increase from 33,680 square feet to 67,360 square feet.
- Attached storage: a new 1,250-square-foot storage structure.
- Truck dock: convert the existing trucking dock into a storage building. The size given for the converted dock is not legible in the county’s public copy.
- Detached storage: a new 1,008-square-foot storage building.
How did the environmental review work?
The county did not prepare a new environmental document. Its Notice of Determination says a previous Mitigated Negative Declaration was used, mitigation measures became conditions of approval and the project “will not have a significant effect on the environment.” No statement of overriding considerations was needed. The CEQAnet posting shows the notice as received Aug. 14, 2026.
Where is the Anvil Steel site on Coberly Road?
The site is 31127 Coberly Road, on the south side of the road, north of Seventh Standard Road and about 500 feet east of Enos Lane, according to CEQAnet. It is APN 090-340-37, a 20.7-acre lot zoned M-2 PD. The state listing names Cherry Avenue and Seventh Standard Road as cross streets.
The land is in unincorporated Kern County with a Shafter address. The 2004 state listing for this stretch of Coberly Road notes State Highway 43 and an Amtrak rail line nearby.
What is the site’s history?
The 2026 filing sits under State Clearinghouse number 2004121109. That number belongs to a December 2004 Negative Declaration for General Plan Amendments 13 and 16, Zone Change 35 on Map 79, and an exclusion from Agricultural Preserve No. 8. It covered 36 acres on Coberly Road (APNs 090-340-04 and -19), then zoned Exclusive Agriculture, including about 21 acres for industrial development. The county’s filing does not explain how the Anvil parcel relates to those two lots.
The 2026 filing names Notice of Decision No. 82-08, approved Aug. 7, 2008, as the plan being modified. It does not describe Modifications 1 and 2. One property listing site and another show a 35,125-square-foot building built in 2009, compared with the county’s 33,680 square feet. The first site’s history table, which it labels public record, lists sales in 2002 and 2023 without naming buyers. The Better Business Bureau lists Lufkin Industries Inc, an oil well supply business, at the address.
Who is Anvil Steel Corporation?
Anvil Steel is a structural and miscellaneous steel fabricator and erector based at 134 West 168th Street in Gardena. According to the company’s history, Phil and Nancy Shallenberger founded it in 1973 in a 10,000-square-foot shop serving the South Bay beach cities. Paul Schifino bought it in 1996. He later acquired Champ Steel, Bickerton Ironworks, Richwell Steel and Junior Steel Co., a distributor and fabricator with roots in 1948.
The company says it runs three fabrication plants with more than 400 employees and ships steel to all 50 states. Its capabilities page lists six locations, more than 30 acres of property and output of 35,000 tons a year. The home page shows work in healthcare, retail, education, industrial and civic buildings. A company biography says Schifino once chaired the California Contractors State License Board. These facts are self-reported. Anvil’s website does not list the Shafter property, and the county filing calls the building a warehouse.
What does the Anvil Steel Shafter warehouse expansion mean for Kern County industrial space?
The expansion adds owner-occupied space to a market with room available and little under construction. A national brokerage’s Q2 2026 Bakersfield industrial report put availability at 10.1% across a 67.4 million-square-foot inventory, with average asking rent of $0.71 per square foot per month, triple net. It counted one building under construction, a 510,000-square-foot facility in Arvin.
A regional brokerage’s Q2 2026 Bakersfield report measured vacancy at 9.55%, down from 10.90% in Q1. It reported 1,489,196 square feet of net absorption over 12 months, an average sale price of $123 per square foot and a 7.23% cap rate. The report said that “logistics facilities face higher vacancy and pricing pressure while specialized and flex properties maintain stronger occupancy and rental rates.” The two reports track different sets of buildings. Nationally, another brokerage report put Q2 2026 vacancy at 6.8%. For help reading numbers like these, see our guide to reading an industrial market report.
Why do owner-user expansions matter?
An owner adding space for its own operation does not add vacant square footage that competes for tenants. Anvil’s 33,680-square-foot addition equals about 6.6% of the 510,385 square feet the regional report counted under construction in Q2 2026.
For owner-users weighing a similar expansion, see our owner-user buying guide.
What else is happening on Coberly Road?
Saed Investments has proposed a 129,236-square-foot furniture warehouse southwest of Coberly Road and Cherry Avenue. The Kern County case page showed a continued Director’s Hearing set for Oct. 1, 2026, with no outcome posted. Nearby, Ross Stores’ annual report lists three facilities in Shafter, and we cover the retailer’s Bakersfield plans in our Ross distribution center story. Coberly Road north of Seventh Standard Road is an established owner-user corridor.
Were there concerns about the expansion?
The Notice of Determination does not mention any objections or concerns. Its packet contains the form, location and zoning maps and fee receipts. It does not list the individual mitigation measures. The county says the environmental document is available at the Planning and Natural Resources Department, 2700 M Street, Suite 100, in Bakersfield.
What happens next for the Anvil Steel Shafter warehouse?
The environmental review is complete. Under the California Environmental Quality Act, filing a Notice of Determination starts a 30-day period for legal challenges, as Remy Moose Manley explains in its summary of a 2010 state Supreme Court ruling. That window ran out in mid-September 2026, and no challenge has been reported. For the wider process, see our guide to industrial land entitlements and CEQA in Kern County.
Building permits and construction come next. Neither the county nor Anvil Steel has published a schedule.
Timeline
- Dec. 21, 2004: The State Clearinghouse receives the Negative Declaration for the Coberly Road general plan amendments and zone change.
- Aug. 7, 2008: Kern County approves Notice of Decision No. 82-08, the plan cited in the 2026 filing.
- Aug. 6, 2026: The Planning and Natural Resources Department approves Modification No. 3.
- Aug. 14, 2026: The State Clearinghouse posts the Notice of Determination.
Frequently asked questions
What did Kern County approve for Anvil Steel in Shafter?
The county’s Planning and Natural Resources Department approved a plan modification on Aug. 6, 2026. Anvil Steel Corporation can expand its warehouse at 31127 Coberly Road from 33,680 to 67,360 square feet. It can also add two storage buildings of 1,250 and 1,008 square feet and turn a truck dock into storage.
Where is the Anvil Steel warehouse?
It sits at 31127 Coberly Road in unincorporated Kern County near Shafter. The lot is on the south side of the road, north of Seventh Standard Road and about 500 feet east of Enos Lane. The 20.7-acre parcel carries M-2 PD zoning, a medium industrial district with a precise development overlay.
Who owns Anvil Steel Corporation?
Paul Schifino is president of Anvil Steel and of Junior Steel Co. The company says he bought Anvil in 1996 from founder Phil Shallenberger, who started it in Gardena in 1973. Schifino later added Champ Steel, Bickerton Ironworks and Richwell Steel.
Did the Anvil Steel expansion need an environmental impact report?
No. The county relied on a Mitigated Negative Declaration adopted earlier. Its Notice of Determination finds no significant environmental effect and makes the mitigation measures conditions of approval. The State Clearinghouse posted the notice on Aug. 14, 2026.
What was on the 31127 Coberly Road site before?
Property data sites show a 35,125-square-foot building from 2009 on the 20.7 acres, and the Better Business Bureau lists an oil well supply company there. The county filed the 2026 approval under the number of a 2004 plan amendment and zone change. That action covered about 21 acres of industrial land then zoned for exclusive agriculture.
How does this expansion affect the Bakersfield industrial market?
It adds owner-occupied space, not leasable inventory. A national brokerage report put Bakersfield availability at 10.1% in Q2 2026, and a regional brokerage report measured 9.55% vacancy. The regional report said specialized and flex properties hold occupancy better than logistics buildings, which fits an owner-user steel operation.
Own an industrial building or yard near Shafter or Seventh Standard Road, or weighing whether to expand in place instead of relocating? Call Kern CRE at 855-KERN-CRE (855-537-6273) or contact us. Get Kern County CRE news monthly: subscribe to the Kern CRE report.
Sources
- Modification #3, Precise Development Plan No. 37, Map 79 (Notice of Determination, SCH 2004121109), CEQAnet, State Clearinghouse, received Aug. 14, 2026.
- Notice of Determination, Anvil Steel (PDF attachment), Kern County Planning and Natural Resources Department, 2026.
- EA KM 1-04; GPA 13, GPA 16; ZCC 35, Map 79; Alteration of Agricultural Boundaries (Negative Declaration), CEQAnet, State Clearinghouse, Dec. 21, 2004.
- History, Anvil Steel.
- Capabilities, Anvil Steel.
- Home page, Anvil Steel.
- About the President, Anvil Steel.
- 31127 Coberly Rd, Shafter, CA 93263 (property details and history), RE/MAX.
- 31127 Coberly Rd, Shafter, CA 93263 (property details), Xome.
- Lufkin Industries Inc, 31127 Coberly Rd, Shafter (business profile), Better Business Bureau.
- Regional brokerage market reports (Bakersfield industrial, Q2 2026).
- Regional brokerage market reports (Bakersfield industrial, July 2026).
- National brokerage market reports (U.S. industrial, July 21, 2026).
- Saed Investments, LLC (Mitigated Negative Declaration, SCH 2026070303), CEQAnet, State Clearinghouse, received July 9, 2026.
- Saed Investments, LLC by Max Bacerra; PLN23-00774 (case page), Kern County Planning and Natural Resources Department, last modified Sept. 25, 2026.
- Annual Report for fiscal year ended Jan. 31, 2026 (Form 10-K), Ross Stores, Inc., 2026.
- Committee for Green Foothills v. Santa Clara County Board of Supervisors (case summary), Remy Moose Manley.
About this article
Kern CRE prepared this article with help from AI research and writing tools. An editor reviewed the draft, checked its facts against the sources linked above and edited it for accuracy and clarity. Details come from public records and the sources cited; unless stated, Kern CRE and ASU Commercial were not involved in the transaction or project.

