Most new buildings on the Kern valley floor must cut construction and traffic emissions or pay a per-ton fee under the Valley Air District’s indirect source rule. Here is how it works, what it costs and how the desert side of the county differs.
SJVAPCD Rule 9510 indirect source review (ISR) is a San Joaquin Valley Air Pollution Control District rule, adopted Dec. 15, 2005 and amended in 2017. It requires new development above set size thresholds to cut nitrogen oxides (NOx) and fine particulate matter (PM10) from construction and from the traffic it generates, either on site or by paying fees. It applies on the Kern valley floor, including Bakersfield, but not in Eastern Kern. The District lists no pending amendment.
Rule 9510 at a glance
| Item | Detail |
|---|---|
| Rule | SJVAPCD Rule 9510, Indirect Source Review, with Rule 3180 administrative fees |
| Adopted / amended | Adopted Dec. 15, 2005 (effective March 1, 2006); amended Dec. 21, 2017 (effective March 21, 2018) |
| Administered by | San Joaquin Valley Air Pollution Control District |
| Where in Kern | Valley floor (Bakersfield, Shafter, Wasco, Delano, Arvin, Taft and nearby); not Eastern Kern APCD territory |
| Who it affects | Developers of residential, commercial, office, industrial and transportation projects above size thresholds |
| Key requirement | Cut construction exhaust NOx 20% and PM10 45%; cut operational NOx 33.3% and PM10 50% over 10 years |
| Off-site fee | $9,350 per ton of NOx and $9,011 per ton of PM10 not reduced on site, per the District’s April 2025 FAQ |
| Status | In effect; not on the District’s 2026 rules-under-development list |
| What to watch | Valley ozone attainment actions, EPA action on District permit rules, warehouse rules under AB 98 |
Key takeaways
- Rule 9510 requires covered projects to cut operational NOx by 33.3% and PM10 by 50% over 10 years, compared with an unmitigated baseline.
- A Kern valley project that needs discretionary approval triggers the rule at 25,000 square feet of light industrial space, 100,000 square feet of heavy industrial space, 2,000 square feet of commercial space or 50 homes.
- Since March 21, 2018, large projects that need only ministerial permits are also covered, starting at 125,000 square feet of light industrial or 500,000 square feet of heavy industrial space.
- Emissions not reduced on site are paid off at $9,350 per ton of NOx and $9,011 per ton of PM10, and the District reinvests the money in Valley clean air grants.
- Eastern Kern, including Tehachapi, Mojave, Rosamond and Ridgecrest, sits outside the Valley Air District, so Rule 9510 does not apply there.
What is SJVAPCD Rule 9510 indirect source review?
Rule 9510 is the Valley Air District’s tool for emissions from buildings that attract vehicles. An indirect source is a facility that does not emit much itself but draws cars and trucks that do: a warehouse, shopping center, office park or subdivision. The current rule text shows the rule was adopted Dec. 15, 2005 and amended Dec. 21, 2017, with the amendments taking effect March 21, 2018. The original 2005 text remains available.
The rule targets the two pollutants behind much of the Valley’s ozone and particulate problems. A developer files an Air Impact Assessment (AIA) application. The District calculates the project’s construction and operating emissions. The developer then designs in reductions or pays an off-site fee for the shortfall. Rule 3180 sets the administrative fees, and the District’s ISR program page lists a Rule 3180 version effective July 1, 2026, which sets the current filing and review charges.
Which projects trigger Rule 9510?
Two doors lead into the rule. Section 2.1 covers projects that need a discretionary approval, such as a conditional use permit, zone change or tentative map, at relatively low thresholds. Section 2.2, added in 2017, covers large projects that need only a ministerial approval, such as a building permit, at higher thresholds. Transportation and transit projects are covered when construction exhaust reaches 2.0 tons of NOx or PM10, according to the 2005 rule text.
Rule 9510 applicability thresholds
| Land use | Discretionary approval (Sec. 2.1) | Large project, ministerial (Sec. 2.2) |
|---|---|---|
| Residential | 50 units | 250 units |
| Commercial | 2,000 SF | 10,000 SF |
| Light industrial | 25,000 SF | 125,000 SF |
| Heavy industrial | 100,000 SF | 500,000 SF |
| Medical office | 20,000 SF | 100,000 SF |
| General office | 39,000 SF | 195,000 SF |
| Educational | 9,000 SF | 45,000 SF |
| Government | 10,000 SF | 50,000 SF |
| Recreational | 20,000 SF | 100,000 SF |
| Other | 9,000 SF | 45,000 SF |
Exemptions include rebuilding a damaged project to the same use and intensity, certain transportation control measures, facilities whose emissions the District reviews mainly under its stationary source permit rule (Rule 2201) and projects whose mitigated baseline falls below 2.0 tons per year each of NOx and PM10. Large projects that already held building permits or similar approvals before March 21, 2018 are exempt from Section 2.2.
What reductions and fees does Rule 9510 require?
Projects must cut construction NOx by 20% and PM10 exhaust by 45%, and operational NOx by 33.3% and PM10 by 50% over 10 years. All percentages are measured against the project’s unmitigated baseline. Construction cuts apply to equipment over 50 horsepower. Operational emissions come mostly from vehicle trips plus area sources.
On-site measures count first: cleaner construction fleets, project design that cuts vehicle trips, electric equipment, bicycle and pedestrian access and similar features. The District’s April 2025 ISR FAQ lists the remaining shortfall at $9,350 per ton of NOx and $9,011 per ton of PM10. The FAQ also says the District has 10 days to determine completeness and 30 days for final review, and that fees go into Valley emission reduction grants.
Required reductions under Rule 9510
| Emission source | NOx reduction | PM10 reduction | Measured over |
|---|---|---|---|
| Construction exhaust (equipment over 50 hp) | 20% | 45% | Construction period |
| Operations (vehicle trips and area sources) | 33.3% | 50% | First 10 years |
| Off-site fee for any shortfall | $9,350 per ton | $9,011 per ton | Paid before District approval |
When must a developer file the Air Impact Assessment?
File early. Timing is the most common trap. For discretionary projects, the AIA application is due no later than the application for final discretionary approval. For Section 2.2 projects, the current rule requires filing no later than applying for, or otherwise seeking, approval from a public agency. In practice that means before the building permit application.
Cities and Kern County typically condition approvals on proof of District ISR approval. Many Valley environmental reviews also pair ISR with a Voluntary Emission Reduction Agreement (VERA), in which the developer funds extra reductions to offset impacts beyond what the rule requires. A VERA is a negotiated contract, not a rule requirement, so its cost varies by project. Our guide to industrial land entitlements and CEQA in Kern County explains where ISR fits in the approval sequence.
Which other air district rules affect new buildings in Kern?
Rule 9510 covers the traffic a building attracts. Equipment inside the building follows a separate track. Boilers, emergency generators, spray booths, refrigeration and process equipment generally need District permits under the New Source Review rule, Rule 2201. Larger sources may need best available control technology and emission offsets. Tenants should budget permitting time when equipment is part of the use.
That permit rule has drawn federal attention. According to the Federal Register, EPA issued a limited disapproval of Rule 2201 on July 10, 2023, which started clocks for offset sanctions after 18 months and highway funding sanctions six months later. The District then amended Rules 1020, 2020 and 2201, and the state submitted them Oct. 13, 2023. EPA deferred the sanctions effective Jan. 21, 2025 while proposing approval. The Federal Register notices cited here do not show a final EPA approval of those amendments.
The Valley also remains out of attainment for federal ozone standards. EPA finalized approval of District Rules 3172 and 3173 in a Federal Register notice published July 30, 2026, effective Aug. 31, 2026. Those rules set federally required ozone nonattainment fees for major stationary sources if the Valley misses the 2008 or 2015 ozone standards. The fees fall on large industrial sources, not ordinary warehouse tenants, but they add to the cost picture for heavy industry.
How does Rule 9510 play out in Kern County, and how is Eastern Kern different?
Kern County is split between two air districts, and Rule 9510 applies only on the Valley side. The San Joaquin Valley Air Pollution Control District (the Valley Air District) covers the valley floor, including Bakersfield, Shafter, Wasco, Delano, McFarland, Arvin and Taft. The Eastern Kern Air Pollution Control District (EKAPCD) is generally understood to cover the desert and mountain area east of the Tehachapi range, including Tehachapi, Mojave, Rosamond, California City and Ridgecrest. Parcels near the line, including Tejon Ranch and the Kern River Valley, are harder to place without the districts’ maps.
The split matters for site selection. A warehouse in Bakersfield or Shafter triggers ISR at the thresholds above. A comparable building in Mojave or Rosamond falls under Eastern Kern’s rules and CEQA practice instead.
Eastern Kern’s own rules focus on stationary sources and dust rather than traffic. Its rule development page lists no indirect source rule. Recent rulemaking covered gas turbines and cement kilns (Rules 425 and 425.3, set for a Nov. 7, 2024 hearing) and a Jan. 13, 2022 package that amended rules including Rule 402 on fugitive dust. Desert projects generally address traffic emissions through CEQA mitigation rather than a per-ton ISR fee.
Two Kern communities get extra attention under California’s AB 617 community air protection program. The Valley Air District’s AB 617 page lists Shafter as a year-one community selected in 2018 and Arvin/Lamont as selected in February 2021. Projects near those communities can expect closer scrutiny of truck routes and emissions during CEQA review, even though Rule 9510’s requirements are the same Valley-wide.
What does Rule 9510 mean for industrial and commercial real estate?
For speculative warehouses and distribution centers, ISR is a predictable line item. Because operational emissions come mostly from truck and car trips, the fee scales with building size and assumed trip generation. Developers often fold the cost into land basis or pricing. For buyers of entitled land, it matters whether ISR has been approved and paid, or only estimated. The same is true of build-to-suit and spec projects. The state’s AB 98 warehouse law adds separate siting and design rules, and the SB 131 CEQA exemption changed some review paths.
For tenants, ISR is usually a landlord issue at construction, but it can resurface with a change of use. A building approved as light industrial that becomes a high-turnover distribution or retail use may need a new AIA if the change requires a new approval. Large Kern proposals such as the Airport Commerce Center face the same review. Fleet rules also shape truck trips, as our Advanced Clean Fleets update explains.
Rule 9510 checklist for Kern County projects
- Confirm whether the parcel is in the Valley Air District or Eastern Kern APCD.
- Compare the project’s size and use with both the Section 2.1 and Section 2.2 thresholds.
- File the Air Impact Assessment early, before applying for final discretionary approval or a building permit.
- Model on-site reduction measures before accepting a fee estimate. Cleaner construction fleets and trip reduction can shrink the bill.
- Budget the off-site fee at $9,350 per ton of NOx and $9,011 per ton of PM10, plus Rule 3180 filing and review fees.
- Ask whether CEQA mitigation will include a VERA and how it will be priced.
- List any permitted equipment (generators, boilers, refrigeration) for a separate Rule 2201 permit review.
- In due diligence on entitled land, get the District’s ISR approval letter and proof of fee payment.
Illustrative example: ISR fees for a 300,000 SF Bakersfield warehouse
The emission figures below are assumptions for illustration only. The District calculates actual baselines with its own models. Assume a 300,000-square-foot light industrial warehouse that needs a conditional use permit, so it triggers Section 2.1. Assume the District estimates an unmitigated operational baseline of 8 tons of NOx and 2 tons of PM10 per year.
Over 10 years, the required operational reductions would be 33.3% of 80 tons of NOx, about 26.6 tons, and 50% of 20 tons of PM10, or 10 tons. Suppose on-site measures achieve 6 tons of NOx and 3 tons of PM10. The remaining 20.6 tons of NOx would cost about $192,610 and 7 tons of PM10 about $63,077. That totals roughly $255,700 before construction-phase and administrative fees.
Illustrative operational ISR fee math (assumed baseline)
| Item | NOx | PM10 |
|---|---|---|
| 10-year baseline (assumed) | 80 tons | 20 tons |
| Required reduction | 33.3% = about 26.6 tons | 50% = 10 tons |
| Achieved on site (assumed) | 6 tons | 3 tons |
| Shortfall | 20.6 tons | 7 tons |
| Fee rate | $9,350 per ton | $9,011 per ton |
| Illustrative fee | about $192,610 | about $63,077 |
Frequently asked questions
What is indirect source review in the San Joaquin Valley?
It is the Valley Air District’s Rule 9510, adopted Dec. 15, 2005. New development above size thresholds must reduce NOx and PM10 from construction and from the vehicle trips it attracts. Developers file an Air Impact Assessment, design in reductions and pay a fee for any shortfall. The rule covers the Valley floor, including Bakersfield.
What size warehouse triggers Rule 9510?
It depends on the approval path. A project needing discretionary approval, such as a conditional use permit, is covered at 25,000 square feet of light industrial space or 100,000 square feet of heavy industrial space. A project needing only ministerial permits is covered at 125,000 and 500,000 square feet, under the amendments effective March 21, 2018.
How much are Rule 9510 fees?
The District’s April 2025 FAQ lists off-site fees of $9,350 per ton of NOx and $9,011 per ton of PM10 that a project does not cut on site. The total depends on project size, trip generation and on-site measures. Rule 3180 adds filing and review fees. Large projects can reach six figures, while small or well-mitigated ones may pay far less.
When do I file the Air Impact Assessment application?
Discretionary projects must file no later than the application for final discretionary approval. Ministerial large projects must file no later than seeking approval from a public agency, which usually means before the building permit application. Per the District’s FAQ, staff has 10 days to check completeness and 30 days for final review, so build that time into your schedule.
Does Rule 9510 apply in Tehachapi, Mojave or Ridgecrest?
No. Those communities fall under the Eastern Kern Air Pollution Control District, not the Valley Air District. Projects there follow Eastern Kern’s permitting and dust rules, plus CEQA air quality review.
Is Rule 9510 being changed?
No pending amendment is listed. The rule was last amended Dec. 21, 2017, and it is absent from the District’s 2026 rules-under-development list, which centers on agricultural practices, coatings, metal shredders and wood burning. Rule 3180, the related fee rule, has a version effective July 1, 2026.
Does Rule 9510 cover equipment like generators and boilers?
No. Rule 9510 deals with construction emissions and the trips a project attracts. Boilers, emergency generators and spray booths need separate permits under the District’s Rule 2201, and facilities mainly subject to that rule are exempt from ISR. A tenant adding equipment should plan for its own permit.
Pricing land or a build-to-suit on the Kern valley floor or in the desert? Call Kern CRE at 855-KERN-CRE (855-537-6273) or contact us to factor air district timing and fees into the deal from the start. Get Kern County CRE news monthly: subscribe to the Kern CRE report.
Sources
- Rule 9510, Indirect Source Review (amended Dec. 21, 2017), San Joaquin Valley Air Pollution Control District.
- Rule 9510, Indirect Source Review (adopted Dec. 15, 2005), San Joaquin Valley Air Pollution Control District.
- Indirect Source Review rule overview, San Joaquin Valley Air Pollution Control District.
- ISR Frequently Asked Questions, San Joaquin Valley Air Pollution Control District, April 25, 2025.
- Rule 3180, Administrative Fees for Indirect Source Review (effective July 1, 2026), San Joaquin Valley Air Pollution Control District, 2026.
- Rules Under Development (2026), San Joaquin Valley Air Pollution Control District.
- Interim Final Determination To Defer Sanctions; San Joaquin Valley Unified Air Pollution Control District, Federal Register (U.S. EPA), Jan. 21, 2025.
- Air Plan Approval; California; San Joaquin Valley Air Pollution Control District (Rules 3172 and 3173, final), Federal Register (U.S. EPA), July 30, 2026.
- Rule Development, Eastern Kern Air Pollution Control District.
- AB 617 Community Air Protection: selected communities, San Joaquin Valley Air Pollution Control District.
About this article
Kern CRE prepared this article with help from AI research and writing tools. An editor reviewed the draft, checked its facts against the sources linked above and edited it for accuracy and clarity. It is general information about air district rules, not legal, engineering or financial advice; talk with the air district and a qualified professional about your situation.