Kern County has started the environmental review for a 640-acre community at Comanche Drive and Breckenridge Road. Scoping comments are due Oct. 26, 2026.
Las Colinas Bakersfield is a proposed 640-acre master-planned community at Comanche Drive and Breckenridge Road in unincorporated Kern County, east of Bakersfield. It calls for 4,236 homes and 200,000 square feet of commercial space on part of the Edison Oil Field. Kern County issued a Notice of Preparation for an environmental impact report (EIR) in September 2026. Nothing has been approved.
Key takeaways
- The State Clearinghouse received Kern County’s Notice of Preparation for the Las Colinas EIR on Sept. 23, 2026, and the county is taking scoping comments through Oct. 26, 2026.
- The plan puts 4,236 homes on 505 acres (2,025 single-family detached and 2,211 attached or multifamily units) and 200,000 square feet of commercial space on 20 acres.
- The site is the Racetrack Hill area of the Edison Oil Field, where production began in 1944. The county counted 102 producing wells and 50 idle wells on the property when it issued the notice.
- A public scoping meeting is set for Wednesday, Oct. 14, 2026, at 1:30 p.m. at the Kern County Planning and Natural Resources Department, 2700 M Street, Suite 100, Bakersfield.
- If approved, construction would be phased over 10 to 15 years as market demand allows.
Las Colinas at a glance
| Item | Detail |
|---|---|
| Project | Las Colinas Specific and Community Plan and Las Colinas Special Plan |
| Location | Comanche Drive and Breckenridge Road, east of Bakersfield (ZIP 93307); about 2 miles north of State Route 58 and 2 miles south of State Route 178; Section 27, T29S, R29E |
| APNs | 388-020-01 and 388-020-02 |
| Applicant / developer | RICK Engineering (applicant of record); Breckenridge Management Company named in the notice as pursuing development |
| Jurisdiction | Kern County (lead agency: Planning and Natural Resources Department) |
| Case numbers | SCH 2026091024; PLN24-00209 (PP25402); Specific Plan Amendment No. 162, Map 500; Specific Plan Amendment No. 10, Map 104; General Plan Amendment No. 9, Map 104; Zone Change Case No. 16, Map 104; Special Plan No. 1, Map 104; CUP No. 15, Map 104; Vesting Tentative Tract Map No. 7537 |
| Size | About 640 acres; 4,236 homes on 505 acres; 200,000 sq. ft. of commercial space on 20 acres; 63 acres of open space |
| Use | Mixed-use residential community with a village core, trails, private recreation and an on-site wastewater package plant |
| Status | Notice of Preparation of a Draft EIR; scoping period Sept. 25 to Oct. 26, 2026; no approvals |
| Next step | Scoping meeting Oct. 14, 2026, 1:30 p.m.; comments due Oct. 26, 2026; Draft EIR to follow |
What is the Las Colinas Specific and Community Plan?
It is a proposed new community on about 640 acres east of Bakersfield. The State Clearinghouse record describes it as a “mixed-use residential community of 4,236 residential units and 200,000 square feet of commercial uses,” with a village core meant to put shopping and services within walking distance of residents.
Kern County’s Planning and Natural Resources Department is the lead agency. The State Clearinghouse received its Notice of Preparation (NOP) on Sept. 23, 2026, starting the EIR process. An NOP asks agencies and the public what the EIR should study. It is not an approval.
The land use budget in the notice breaks down as follows.
| Land use | Acres (share of site) |
|---|---|
| Residential: 4,236 units | 505 acres (79%) |
| Commercial: 200,000 sq. ft. | 20 acres (3%) |
| Open space, trails and private recreation | 63 acres (10%) |
| Roads | 47 acres (7%) |
| Wastewater treatment package facility | 5 acres (1%) |
| Total | About 640 acres |
The housing mix is close to an even split: 2,025 single-family detached homes and 2,211 multifamily and single-family attached units. Allowed densities run from 1 to 10 units per acre in low-density areas up to 60 in high-density and mixed-use areas. By our math, the plan averages about 8.4 units per residential acre.
California Water Service’s Bakersfield District would supply water, with up to two 5-million-gallon reservoirs on site, according to the NOP. Sewage would go to a private wastewater package treatment plant, which needs its own conditional use permit. The State Clearinghouse summary separately lists an on-site water facility of 1 million gallons per day, a capacity the NOP does not state.
What approvals does Las Colinas need?
Las Colinas needs eight county actions, and none has been granted. The NOP lists them as follows:
- Remove about 520 acres from the Breckenridge Hills Specific Plan (Specific Plan Amendment No. 10, Map 104).
- Adopt the Las Colinas Specific and Community Plan and its land use designations (Specific Plan Amendment No. 162, Map 500).
- Amend the Metropolitan Bakersfield General Plan from R-MP (Mineral and Petroleum) and R-EA (Extensive Agriculture) to Map Code 4.1, Accepted County Plan Areas (General Plan Amendment No. 9, Map 104).
- Rezone about 640 acres from A (Exclusive Agriculture) to SP (Special Planning) District (Zone Change Case No. 16, Map 104).
- Approve the Las Colinas Special Plan (Special Plan No. 1, Map 104).
- Approve a conditional use permit for the wastewater package treatment plant (CUP No. 15, Map 104).
- Exclude 640 acres from Agricultural Preserve No. 13.
- Approve Vesting Tentative Tract Map No. 7537, which the notice says is “for financing purposes.”
That last item matters for land buyers. The NOP says Tract Map 7537 would create planning-area enclaves for mass grading and large builder pads. In practice, that kind of structure typically lets a master developer finance grading and sell or joint-venture pads to homebuilders in phases, rather than building every house itself. Our guide to industrial land entitlements and CEQA in Kern County explains how the process works.
Where is Las Colinas Bakersfield?
The site sits in the foothills east of Bakersfield, in ZIP code 93307. The NOP says Comanche Drive and Breckenridge Road bisect the property, which lies about two miles north of State Route 58 and two miles south of State Route 178. The State Clearinghouse record lists Assessor’s Parcel Numbers 388-020-01 and 388-020-02.
The notice describes oil extraction to the north, east and west, and farmland with citrus orchards and table grapes to the south. A private airstrip sits about three-quarters of a mile southwest. The nearest school listed is Cesar Chavez Elementary at 4201 Mesa Marin Drive, about two miles northwest.
This is edge land, not infill. The plan carries much of its own infrastructure, including water reservoirs, a private sewer plant and its own retail core. The City of Bakersfield’s planned growth areas sit nearby; see our look at the Bakersfield 2045 General Plan.
What was on the Las Colinas site before?
Oil. The NOP says the area “was historically known as Racetrack Hills and is part of the Edison Oil Field, formerly owned by Chevron.” According to the Wikipedia history of the Edison Oil Field, the field was discovered in 1928 and its Racetrack Hill area came online in 1944. The heavy oil there has been produced with steam injection, and a steam system is still in place.
The property is still a working oil field. The notice describes active wells, a gas-fired steam plant, related facilities and a tank battery. At the time of the NOP, it counted 102 producing wells, 70 abandoned wells, 50 idle wells, 11 steam injection wells and two water disposal wells.
The NOP says mineral extraction will continue as development is pursued. As homes are built, state Health Protection Zone rules would apply to the existing wells, and the mineral rights owner or operator would run well abandonment programs. How the wells and steam plant are retired or set back from new homes will be a central EIR question.
Earlier plans for the area
This land has sat inside a county specific plan for decades. The Breckenridge Hills Specific Plan covered about 5,800 acres near Edison Highway and Comanche Road, and the NOP says it was adopted Oct. 9, 1989. The State Clearinghouse shows a negative declaration for the plan received Oct. 5, 1987. Las Colinas would pull about 520 acres out of that plan.
Today the site is designated Mineral and Petroleum and Extensive Agriculture, with seismic, flood hazard and erosive soil overlays, and it is zoned Exclusive Agriculture. It is inside Agricultural Preserve No. 13 but, per the NOP, is not Prime Farmland and is not under a Williamson Act contract.
Who is behind Las Colinas?
The State Clearinghouse lists the project as “Las Colinas Specific and Community Plan by RICK Engineering.” RICK is an engineering and planning firm with offices in California, Nevada, Arizona and Colorado, though none in Bakersfield.
The NOP says mineral extraction will continue “as Breckenridge Management Company (BMC) pursues development of the property.” The notice does not name a property owner or a homebuilder.
What does Las Colinas mean for the Kern County housing and retail market?
Price is the draw. The California Association of Realtors reported a Kern County median of $400,500 for existing single-family homes in August 2026, down 3.5% from a year earlier, against a statewide median of $901,420. Kern sales fell 17.2% year over year, and the unsold inventory index stood at 3.7 months.
Rentals are steady. A regional brokerage’s Q2 2026 Bakersfield multifamily report put vacancy at 5.20%, down from 6.18% a year earlier, with average asking rent of $1,424 per unit and 892 units under construction. Against that report’s 26,606-unit inventory, Las Colinas’ 2,211 attached and multifamily units would add about 8% if all were rentals, spread over 10 to 15 years.
Las Colinas is not the only large community moving through the county. Kern County supervisors approved an amendment to Grapevine at Tejon Ranch, a 12,000-home plan along Interstate 5, on Sept. 29, 2026, according to the county’s Grapevine project page and a State Clearinghouse filing posted Oct. 1, 2026. Las Colinas is about a third of that size but sits much closer to Bakersfield’s job base and services.
The 200,000-square-foot village core
Bakersfield retail is tight, and little is under construction. A regional brokerage’s Q2 2026 Bakersfield retail report put vacancy at 5.2% and the average NNN asking rate at $20.26 per square foot. Only 8,630 square feet were under construction in a 37.5-million-square-foot market. A national brokerage’s Q2 2026 U.S. retail report put Bakersfield shopping-center vacancy at 6.5% (preliminary).
A 200,000-square-foot village core on 20 acres works out to a floor-area ratio of about 0.23, a typical suburban center footprint. Retail of this kind usually follows rooftops, so expect the commercial pads to come after the first phases of homes close. For land buyers and investors, the near-term opportunity is more likely builder pads and land than finished retail. Our story on the 7th Standard Marketplace Costco shows how retail follows rooftops on Bakersfield’s edges.
What issues will the Las Colinas EIR study?
The State Clearinghouse record flags more than 30 topics, including air quality, biological resources, flooding, geology and soils, hazardous materials, mineral resources, schools, sewer capacity, transportation and wildfire.
The oil field is the issue most specific to this site. According to the California Geologic Energy Management Division (CalGEM), SB 1137 creates a 3,200-foot Health Protection Zone around homes, schools and other sensitive locations. CalGEM stopped approving new well permits inside those zones. By July 1, 2030, operators must suspend production and injection within a zone unless an approved leak detection and response plan is fully in place. New homes on and around the field would expand those zones over the existing wells. Our SB 1137 explainer covers the rule in detail.
Other EIR questions include the private sewer plant, the seismic, flood and erosive soil overlays already mapped on the site, and traffic on Comanche Drive, Breckenridge Road and the routes to Highways 58 and 178. The Native American Heritage Commission has already filed a comment letter on the notice. No news coverage or organized opposition to the project has been reported.
What happens next for Las Colinas?
The 30-day scoping period runs from Sept. 25 to Oct. 26, 2026. The county will hold a scoping meeting on Wednesday, Oct. 14, 2026, at 1:30 p.m. at the Planning and Natural Resources Department, 2700 M Street, Suite 100, Bakersfield, to explain the California Environmental Quality Act (CEQA) process and take comments.
Written comments go to Sara Eickenhorst, Planner III, at EickenhorstS@kerncounty.com or (661) 862-5040, per the State Clearinghouse record. After scoping, the county will prepare a Draft EIR and release it for public review. Planning Commission and Board of Supervisors hearings would follow, and none is scheduled yet.
If the plan is approved, the NOP says construction would be phased over 10 to 15 years after all permits are in hand, with planning areas developed as market demand allows.
Frequently asked questions
Where is Las Colinas in Bakersfield?
Las Colinas is proposed on about 640 acres at Comanche Drive and Breckenridge Road in unincorporated Kern County, east of Bakersfield in ZIP code 93307. The county places it about two miles north of State Route 58 and two miles south of State Route 178. It covers Assessor’s Parcel Numbers 388-020-01 and 388-020-02, in the Racetrack Hill area of the Edison Oil Field.
How many homes are planned at Las Colinas?
The plan calls for 4,236 homes on 505 acres, split between 2,025 single-family detached homes and 2,211 multifamily and attached units. Densities range from 1 unit per acre in low-density areas to 60 in high-density and mixed-use areas. It also sets aside 200,000 square feet of commercial space on 20 acres and 63 acres for open space and trails.
Who is developing Las Colinas?
RICK Engineering is the applicant of record with the State Clearinghouse. The county’s Notice of Preparation says Breckenridge Management Company is pursuing development of the property. The notice does not name a landowner or a homebuilder.
Has Las Colinas been approved?
No. Kern County has issued only a Notice of Preparation, the first step in preparing an EIR. The project still needs a general plan amendment, specific plan adoption, a zone change, a use permit, an agricultural preserve exclusion and a tract map. No Planning Commission or Board of Supervisors hearing has been scheduled.
How can I comment on the Las Colinas EIR?
Send written comments by Oct. 26, 2026, to Sara Eickenhorst, Planner III, Kern County Planning and Natural Resources Department, 2700 M Street, Suite 100, Bakersfield, CA 93301, or EickenhorstS@kerncounty.com. You can also attend the scoping meeting on Wednesday, Oct. 14, 2026, at 1:30 p.m. at the same address.
What happens to the oil wells on the Las Colinas site?
Oil production continues while the project moves through review. The property had 102 producing wells, 50 idle wells, 11 steam injection wells, two water disposal wells and 70 abandoned wells when the notice was issued. If homes are built, state Health Protection Zone rules would apply, and the mineral rights owner or operator would carry out well abandonment programs.
When would Las Colinas be built?
Not soon. A Draft EIR, public review and county hearings must come first. If the plan is approved, the notice says construction would run 10 to 15 years after all permits are in place, with planning areas built out as market demand allows.
If you own land near Comanche Drive, Breckenridge Road or the Highway 178 corridor, or you are weighing a land play on Bakersfield’s east side, Kern CRE can help you think through what Las Colinas could mean for values and timing. Call Kern CRE at 855-KERN-CRE (855-537-6273) or contact us.
Get Kern County CRE news monthly: subscribe to the Kern CRE report.
Sources
- Las Colinas Specific and Community Plan by RICK Engineering (NOP, SCH 2026091024), CEQAnet, State Clearinghouse, received Sept. 23, 2026.
- Notice of Preparation of a Draft EIR, Las Colinas Specific and Community Plan, Kern County Planning and Natural Resources Department, September 2026.
- Notice of Completion, Las Colinas NOP, Kern County Planning and Natural Resources Department, September 2026.
- Comment letter on SCH 2026091024, Native American Heritage Commission, 2026.
- Breckenridge Hills Specific Plan, GPA #1, Map 104 (Negative Declaration, SCH 1987041315), CEQAnet, received Oct. 5, 1987.
- Edison Oil Field, Wikipedia.
- Locations, RICK Engineering.
- Understanding California’s Oil and Gas Safety Zones: Senate Bill 1137, California Geologic Energy Management Division.
- August home sales and price report, California Association of Realtors, Sept. 16, 2026.
- Regional brokerage market reports (Bakersfield multifamily, July 2026).
- Regional brokerage market reports (Bakersfield retail, July 2026).
- National brokerage market reports (U.S. retail, July 2026).
- Grapevine Specific and Community Plan (2019) project page, Kern County Planning and Natural Resources Department, updated Sept. 25, 2026.
- Kern County documents received Oct. 1, 2026, including the Grapevine Notice of Determination (SCH 2014041005), CEQAnet, State Clearinghouse, Oct. 1, 2026.
About this article
Kern CRE prepared this article with help from AI research and writing tools. An editor reviewed the draft, checked its facts against the sources linked above and edited it for accuracy and clarity. Details come from public records and the sources cited; unless stated, Kern CRE and ASU Commercial were not involved in the transaction or project.
Featured image: an oil pumpjack beside homes, shown for illustration, not the Las Colinas site. Photo by haymarketrebel, Flickr, CC BY 2.0.

