When to Start Your Commercial Lease Renewal (and How to Decide Whether to Renew or Relocate)

Most tenants start too late and negotiate against their own deadline. Here is the timeline, the lease clauses to check first and a simple way to compare staying with moving.

Start a commercial lease renewal 12 to 18 months before your lease expires. Start 18 to 24 months out if you occupy a large or heavily improved industrial building. That runway lets you confirm your option deadline, price a real relocation alternative and negotiate before the landlord knows you are short on time. Renew when the cost of moving exceeds the rent you would save.

Key takeaways

  • Most industrial tenants should open renewal talks 12 to 18 months before expiration. Large or specialized users should start at 18 to 24 months.
  • National brokerage research reports that occupiers signed industrial renewals an average of 219 days before expiration in 2025. That is usually too late to run a credible relocation search.
  • AIR CRE option language makes the exercise window “time being of the essence,” so a late notice can forfeit your right to renew.
  • Racking, permits, power and downtime mean a cheaper building can cost more over a five-year term than staying put.
  • A priced relocation alternative is your best renewal leverage, even if you fully expect to stay.

When should you start a commercial lease renewal?

For most industrial tenants in Bakersfield and the rest of Kern County, the right time to start is 12 to 18 months before the lease expires. Larger users, and anyone with heavy power, cold storage, food-grade finishes or extensive racking, should start 18 to 24 months out. Brokerage guidance for larger occupiers on office lease renewals gives the same 18-to-24-month window, and the logic carries over to industrial space.

Many tenants start much later. Brokerage research found that occupiers signed industrial renewals an average of 219 days before expiration in 2025, nearly 30 days sooner than in 2024. Seven months is enough time to paper a renewal. It is rarely enough to find, negotiate, permit and move into a replacement building if talks stall.

Starting early does not commit you to anything. It means the landlord is negotiating with a tenant who has options instead of a tenant who has a deadline. These start times are broker guidance, not a published standard.

Suggested renewal start times for industrial tenants

Your situationStart talksWhy
Under 10,000 SF, light improvements9 to 12 months outSmaller spaces turn over faster and moves are simpler
10,000 to 50,000 SF warehouse or shop12 to 18 months outTime to tour, compare proposals and permit racking at a new site
50,000 SF and up, distribution18 to 24 months outFewer comparable buildings and longer improvement timelines
Heavy power, cold storage or specialized process18 to 24+ months outReplicating power, refrigeration or process lines elsewhere takes the longest

What does your lease already say about renewal?

Pull the lease and every amendment before you call the landlord. Look for four items: an option to extend, the window to exercise it, how option rent is set and the holdover clause. Together they define your floor and your deadline. Our guide to renewal options, ROFR and ROFO rights covers these clauses in more detail.

The option notice window

Many California industrial leases use AIR CRE forms. The AIR option-to-extend addendum (a 2014 historical version) requires written notice that the landlord receives “at least __ but not more than __ months” before the option period begins, “time being of the essence.” Miss the window by even a day and the landlord may treat the option as gone.

That addendum also makes the option personal to the original tenant and conditions it on the tenant not being in default. If you have assigned the lease, sold the business or received a default notice, the option may no longer be available. Current AIR forms may word these provisions differently.

How option rent is set

The same addendum offers three ways to set option rent: a cost-of-living (CPI) adjustment, a fixed increase, or market rental value set by negotiation and, if the parties cannot agree, arbitration. A market-rent option protects your right to stay but not your price.

Holdover is not a strategy

If the lease expires without a deal, the AIR single-tenant net lease (in a 2015 version filed with the U.S. Securities and Exchange Commission) raises base rent to 150% of the rate in effect just before expiration. California Civil Code section 1945 presumes a renewal on the same terms if the landlord accepts rent after expiration, but only for the rent period, which is not more than one month when rent is paid monthly. Your lease’s holdover clause will drive the economics, so do not plan around it.

Should you exercise your renewal option or negotiate a new deal?

Treat an option as insurance, not a negotiating strategy. If your option rent is fixed and below today’s market, exercise it on time, in writing, using the notice method the lease requires. If option rent is set at fair market value, exercising early can lock you into the landlord’s view of market without the free rent or improvements a new tenant would receive.

The usual approach is to open renewal talks well before the option window, negotiate a renewal amendment and keep the option as a fallback. Calendar the last day to exercise. If that date arrives with no signed deal, decide deliberately, because an exercised option usually binds you as well as the landlord. Put the agreed terms in a letter of intent before the amendment is drafted.

A renewal is also the moment to fix what the original lease got wrong, such as an uncapped CAM clause or a vague restoration obligation.

What does relocating really cost an industrial tenant?

Office tenants move desks. Industrial tenants move operations. The rent difference between two buildings is the easy number; the one-time costs and the risk of downtime in your busy season usually decide the question.

Relocation cost checklist for an industrial move

Cost itemWhat drives itWho usually pays
Moving inventory and equipmentVolume, rigging, specialized machineryTenant
Racking teardown and reinstallRack type, anchoring, engineeringTenant, sometimes offset by TI
High-piled storage and rack permitsFire code review of layout, commodities and sprinklersTenant
Power, compressed air, IT and securityCapacity and distribution at the new buildingNegotiable through TI
Office, restroom and dock improvementsCondition of the new buildingNegotiable through TI allowance
Overlap rentGap between move-in readiness and old lease endTenant
Restoration of the old spaceRemoving racking, cabling and signage; repairsTenant, per the lease
Downtime and customer disruptionSeasonality, staffing, shipping commitmentsTenant

Permits and total occupancy cost

In unincorporated Kern County, the Kern County Fire Department requires a permit for high-piled combustible storage. The application needs plans showing storage heights, rack layout, aisle widths, commodity classifications and fire protection systems, and the permit is renewed annually. Cities such as Bakersfield have their own fire prevention offices, so the agency with jurisdiction depends on the building’s location. Budget time for plan review before racking goes up. Our guide to ESFR sprinklers and high-piled storage permits explains the fire code side.

Compare total occupancy cost, not just base rent. A building that recently sold may carry a higher Prop 13 assessed value, and therefore higher property tax pass-throughs under an NNN lease, than the building you occupy now. See our explainer on Prop 13 reassessment for NNN tenants.

How does the Bakersfield industrial market affect your renewal leverage?

Leverage depends on how many real alternatives you have. A regional brokerage report put Bakersfield industrial vacancy at 9.55% in Q2 2026, down from 10.90% in Q1. It put the average NNN asking rate at $10.05 per square foot and roughly 1.49 million square feet of positive net absorption over the prior 12 months. The report does not name a period for the asking rate. The figure is far above monthly asking rents in the market, so this article treats it as annual, or about $0.84 per square foot per month.

The same report notes that logistics facilities face higher vacancy and pricing pressure while specialized and flex properties hold stronger occupancy. A tenant in a generic distribution building usually has more alternatives, and more leverage, than a tenant in a hard-to-replace building with heavy power or a cold room.

Nationally, brokerage research expected renewals to account for more than 35% of 2026 industrial leasing volume, well above the historical average of 24%. It also reported that many landlords are offering larger TI allowances and longer free rent to secure earlier renewals, according to a Q2 2026 national industrial report. With only 510,385 SF under construction in Bakersfield in Q2 2026, per the regional brokerage report, that window may narrow.

What should you ask for in a lease renewal?

Treat a renewal like a new lease negotiation. When you stay, the landlord avoids vacancy, a new leasing commission and new-tenant improvements, and part of that saving belongs in your deal.

  • Rent reset to market, supported by recent comparable leases rather than the landlord’s asking rate.
  • Free rent or a refurbishment allowance for items such as LED lighting, dock levelers, office paint and HVAC. Our guide to net effective rent shows how to value these concessions.
  • Escalations that match the market, whether fixed bumps or CPI with a cap.
  • Building system commitments, such as a roof or HVAC replacement completed before the new term starts.
  • Flexibility, including a new renewal option, expansion rights or a right of first offer on adjacent space.
  • Clean-up of old terms, such as CAM caps and exclusions, clear restoration obligations and current insurance requirements.
  • A reduced guarantee or deposit if your business has a strong payment history.

Renew or relocate? A 40,000 SF Bakersfield warehouse over five years

Consider a distributor in a 40,000 SF Bakersfield warehouse with 14 months left on its lease. The landlord’s first renewal offer is $0.88 per SF per month NNN with 2 months of free rent. A comparable building nearby is offered at $0.82 NNN with 4 months free. Both deals run five years with 3.5% annual increases. All figures here are illustrative, not quotes or market data.

Relocating saves about $215,000 in base rent. One-time costs eat most of it. Using illustrative estimates of $110,000 for moving and racking, $55,000 for permits, electrical and IT, $32,000 for one month of overlap rent and $25,000 to restore the old space, the move costs $222,000 before any downtime.

The real value of the alternative is leverage. Presented with a credible relocation analysis, the landlord agrees to $0.84 with 3 months free, about $133,000 less than its first offer. NNN expenses are excluded and assumed similar. A recently sold building could carry higher property taxes.

Five-year base rent comparison (illustrative)

Renew at first offerRelocateNegotiated renewal
Starting rent ($/SF/month NNN)$0.88$0.82$0.84
Year 1 monthly base rent$35,200$32,800$33,600
Free rent2 months4 months3 months
5-year base rent after free rent$2,194,706$1,979,467$2,061,346
One-time relocation costs$0$222,000$0
5-year total$2,194,706$2,201,467$2,061,346

Frequently asked questions

How far in advance should I start a commercial lease renewal?

Most industrial tenants should start 12 to 18 months before expiration. Users of 50,000 SF or more, and tenants with heavy power, cold storage or specialized improvements, should start 18 to 24 months out. Small, simple spaces can often start 9 to 12 months out. The option notice window may fall earlier than you expect.

What happens if I miss my lease renewal option deadline?

You may lose the option. AIR CRE option language requires the landlord to receive written notice within a stated window and treats timing as “of the essence,” which gives the landlord grounds to refuse a late exercise. You can still negotiate a renewal, but without the option you have no contractual right to stay. If a deadline has already passed, ask an attorney to review the lease.

What happens if my commercial lease expires and I stay?

You become a holdover tenant. The AIR single-tenant net lease raises base rent to 150% of the last rate during holdover, and other leases carry similar penalties plus liability for the landlord’s damages. Civil Code section 1945 presumes only a short renewal, and only if the landlord accepts rent. Holding over is expensive and should not be the plan.

Is it cheaper to renew or relocate an industrial lease?

Often renewing is cheaper once one-time costs are counted. Moving inventory, reinstalling racking, permitting high-piled storage, replicating power and IT, overlap rent and restoration can erase several years of rent savings. Compare the full five-year cost of each option, including downtime risk, and use the relocation alternative to negotiate a better renewal.

Does a landlord have to renew a commercial lease?

No. California does not require a landlord to renew a commercial lease unless the lease grants the tenant an option to extend and the tenant exercises it correctly. Without an option, the landlord can decline to renew or offer new terms. Knowing your option rights early is the first step.

Should I hire a tenant rep broker for a lease renewal?

For most industrial renewals, yes. A tenant rep broker surveys alternatives, gathers comparable lease data and runs the renew-versus-relocate analysis that gives you leverage. In many transactions the landlord pays the broker’s fee under its listing or commission agreement.

If your Kern County lease expires in the next two years, Kern CRE can point you to the right questions on option dates, comparable lease rates and a renew-versus-relocate comparison for your space. Call Kern CRE at 855-KERN-CRE (855-537-6273) or contact us.

Get Kern County CRE news monthly: subscribe to the Kern CRE report.

Sources

  1. National brokerage market reports (U.S. industrial, January 2026).
  2. National brokerage market reports (U.S. industrial, July 2026).
  3. Regional brokerage market reports (Bakersfield industrial, July 2026).
  4. Regional brokerage market reports (office).
  5. Option(s) to Extend addendum (historical form, with cost-of-living adjustment), AIR CRE, 2014.
  6. Standard Industrial/Commercial Single-Tenant Lease – Net, Exhibit 10.4, Paragraph 26 Holdover, AIR CRE (as filed with the U.S. Securities and Exchange Commission), 2021 filing of a 2015 form.
  7. California Civil Code section 1945, California Legislature via Justia, 2025 code.
  8. High-Piled Combustible Storage Permit Requirements, Kern County Fire Department, 2022.

About this article

Kern CRE prepared this article with help from AI research and writing tools. An editor reviewed the draft, checked its facts against the sources linked above and edited it for accuracy and clarity. It is general information, not legal, tax, investment or financial advice; talk with a qualified professional about your situation.