SB 237 Kern County Oil Permits: How the 2025 Law Restarted Drilling Approvals

After a decade of CEQA litigation stalled Kern County’s oil permitting, a 2025 state law declared the county’s review sufficient. Here is what SB 237 does, what it does not do, and what it means for land and industrial property in Kern County, California.

SB 237 Kern County oil permits are the drilling approvals Kern County resumed on Jan. 2, 2026 under Senate Bill 237 (Chapter 118, Statutes of 2025), signed Sept. 19, 2025. The law deems the county’s 2025 environmental review sufficient, limits the California Geologic Energy Management Division (CalGEM) to 2,000 new-well approvals a year until Jan. 1, 2036, and bars approvals inside SB 1137 health protection zones. It remains in effect.

SB 237 at a glance

ItemDetail
LawSenate Bill 237 (Grayson), Chapter 118, Statutes of 2025; Kern provisions in Public Resources Code Section 21080.81
SignedSept. 19, 2025, as part of a larger fuels and energy package
EffectiveJan. 1, 2026; Kern County reopened its permit portal Jan. 2, 2026
Administered byKern County Planning and Natural Resources Department (lead agency) and CalGEM (responsible agency, and lead agency inside 3,200-foot zones)
Who it affectsKern oil operators, mineral owners, oilfield service firms, surface owners and neighbors of oil fields
Key requirementNo more than 2,000 CalGEM approvals per calendar year to drill new wells, unless the Energy Commission finds more are needed to supply 25% of in-state refinery demand
LimitNo approval relying on the county’s review for any operation in an SB 1137 health protection zone
StatusIn effect; 23ABC reported statewide new-drill permits rose to 353 in the first half of 2026 versus 17 in all of 2025
What to watchSunset on Jan. 1, 2036, any new CEQA challenges, SB 1137 litigation, and Energy Commission fuels recommendations

Key takeaways

  • SB 237 made Kern County’s 2025 second supplemental environmental impact report sufficient under the California Environmental Quality Act (CEQA) for county-issued oil permits until Jan. 1, 2036.
  • Under SB 237, CalGEM may approve no more than 2,000 notices of intention per calendar year to drill new wells, unless the Energy Commission finds more are needed to supply 25% of in-state refinery feedstock.
  • Kern County reopened its oil permit portal on Jan. 2, 2026. County officials said more than 300 permits for new and existing wells were issued in the first month.
  • SB 237 does not touch SB 1137 setbacks. No approval may rely on the Kern review for any operation inside a 3,200-foot health protection zone.
  • Statewide new-drill permit approvals rose to 353 in the first half of 2026, compared with 17 in all of 2025, according to 23ABC.

What is SB 237 and why did California pass it?

SB 237 is a 2025 state law that lets Kern County resume issuing oil and gas permits under its own environmental review. Sen. Tim Grayson authored it, with Kern-area Sen. Melissa Hurtado among its coauthors, and LegiScan’s bill history shows approval on Sept. 19, 2025 as Chapter 118. Gov. Gavin Newsom signed it with a handful of other energy bills, including AB 1207 and SB 840, the cap-and-invest extension covered in our California cap-and-invest guide.

The backdrop was refinery capacity. CapRadio reported that Valero and Phillips 66 had announced possible California refinery closures, threatening higher gasoline prices. A Greenberg Traurig alert framed the bill as a response to refinery closures, high fuel costs and in-state production that has declined since 1985.

The bill’s Kern provisions solve a narrow but expensive problem. The county had spent a decade trying to get its oil permitting ordinance through CEQA litigation. Rather than rewrite oil law, SB 237 declares the county’s latest environmental review legally sufficient.

Why were Kern County oil permits stopped?

Courts repeatedly found the environmental review behind Kern’s oil ordinance inadequate. Kern adopted an oil and gas zoning ordinance in November 2015 so the county, not each project, would handle CEQA review for most drilling. The Fifth District Court of Appeal’s 2024 opinion in V Lions Farming v. County of Kern recounts the history below.

Kern County oil permitting litigation timeline

DateEvent
November 2015Board of Supervisors adopts Ordinance G-8605 and an EIR forecasting about 2,697 new wells a year across 3,700 square miles
February 2020King & Gardiner Farms v. County of Kern (45 Cal.App.5th 814) finds CEQA violations on water supply, PM2.5, agricultural land and noise
March 8, 2021Board adopts revised Ordinance G-8992 after a supplemental recirculated EIR
June to November 2022Superior Court finds four CEQA violations, suspends the ordinance, then discharges its writ on Nov. 2, 2022
January 2023Appeals court halts county permitting pending review, after more than 1,000 permits were issued in about two months
March 7, 2024Fifth District reverses, faulting the review on cancer risk near sensitive receptors, water supply impacts and dropping agricultural easement mitigation
2025County prepares a second supplemental recirculated EIR and amends the ordinance
Sept. 19, 2025SB 237 signed, deeming that review sufficient
December 2025Court discharges the writ; county announces permits will resume
Jan. 2, 2026County permit portal reopens

Sources for the 2023 and 2025 to 2026 steps include ESG Dive, a Bakersfield Californian headline from January 2023, and Bakersfield Now. Meanwhile, state-issued permits had slowed to a trickle: 23ABC reported only 17 new-drill approvals statewide in 2025.

What does SB 237 do for Kern County oil permits?

SB 237 deems the county’s environmental review sufficient and puts a ceiling on new-well approvals. The Kern language lives in new Public Resources Code Section 21080.81. It deems the county’s 2025 second supplemental recirculated EIR sufficient for adopting the amended zoning ordinance. It also says projects the county approves under that ordinance need no further environmental review, and the finding is final for responsible agencies relying on the report.

CalGEM explains the split this way: Kern County is the lead agency, and CalGEM becomes a responsible agency that relies on the county’s EIR and permit record. CalGEM issued a notice to operators with interim CEQA procedures on Nov. 3, 2025.

The 2,000-well annual cap

CalGEM may not approve more than 2,000 notices of intention per calendar year to drill new wells. CalGEM’s own page describes this as 2,000 new well drilling permits annually. The cap lifts only if the State Energy Resources Conservation and Development Commission (the Energy Commission) formally finds that more permits are needed for in-state crude to supply 25% of in-state refinery feedstock demand.

The health protection zone carve-out

No approval by the county or CalGEM may rely on the Kern review for any operation in a health protection zone, the 3,200-foot buffer created by SB 1137, regardless of whether Section 3281 is enforceable. CalGEM is the lead agency for Kern projects to drill or rework a well within 3,200 feet of a residence, educational facility, youth center or health care facility. Our SB 1137 explainer covers those setbacks in detail.

Sunset

Section 21080.81 remains in effect only until Jan. 1, 2036. After that, Kern permits would need a new legal basis for CEQA compliance unless the Legislature extends it.

What else is in SB 237?

SB 237 is also a fuels and pipeline bill. The provisions below matter to refiners, pipeline owners and fuel buyers more than to Kern landowners, but they explain why the bill moved as part of an energy package.

SB 237 provisions outside Kern County permitting

ProvisionWhat it does
Gasoline specifications (Health and Safety Code 43830.5)Lets the Governor suspend summer-blend vapor pressure limits when retail prices spike, if suspension is found necessary to protect consumers
Fuels assessment (Public Resources Code 25371 and 25371.4)Directs the Energy Commission to evaluate alternative gasoline specifications, including a West-wide specification, and to report recommendations by March 31, 2026
Idle pipeline restarts (Government Code 51014.1)Oil pipelines 6 inches or larger idle for five years or more need spike hydrostatic testing at 139% of maximum operating pressure before restart; results posted publicly
Coastal oil transport (Public Resources Code 30262)Requires best available technology and a new coastal development permit to reactivate pipelines idle five years or more
Oil spill prevention (Government Code 8670.28, 8670.37.51)Requires public posting of spill-response certificate applications and periodic review of worst-case spill volumes and financial responsibility

The Energy Commission’s SB 237 proceeding page describes the assessment but gives no publication date for its recommendations.

What has happened since Kern County restarted oil permits?

Permitting resumed quickly and has run mostly through Kern. 23ABC reported on Jan. 31, 2026 that county officials had issued more than 300 permits for new and existing wells since Jan. 2. Chevron had submitted 138 new-well applications to the county, with six approved at that point.

By September, 23ABC reported 353 new-drill permits approved statewide in the first half of 2026, versus 17 in all of 2025. California Resources Corp. said it had received 193 of the 194 permits it sought for 2026, and four of its five active rigs were in Kern, supporting roughly 360 jobs. Consumer Watchdog, citing FracTracker analysis of CalGEM data, said all but one of the 245 permits approved in the first quarter were for Kern operations. The counts differ because the sources define permits differently, and CalGEM publishes its own drill tracker.

Reactions split along familiar lines. Supervisor Jeff Flores told Bakersfield Now, “This is really a new day,” citing the local ordinance, the court clearance and state backing. Earthjustice attorney Colin O’Brien said, “We think it is a shame the county intends to sacrifice residents’ health to temporarily boost a failing industry.” The Western States Petroleum Association’s Jodie Muller credited “a much more well-rounded conversation with all stakeholders,” per CapRadio.

What does SB 237 mean for Kern County industrial and commercial real estate?

Drilling programs need yards, so the restart supports demand for industrial outdoor storage and service-company shops. Rigs, pipe, chemicals, workover equipment and trucks stage on yards and shops along Rosedale Highway, in Taft and around McKittrick. Our guide to industrial outdoor storage explains that property type. A Q2 2026 Bakersfield market report from a national brokerage put average asking rent in its Outlying Kern County submarket at $0.61 per SF per month NNN, below the Bakersfield metro average of $0.71.

Bakersfield’s broader industrial market was already tightening. Regional brokerage data showed vacancy of 9.55% in Q2 2026, down from 10.90% in Q1. A sustained permit run would add to that, but owners should underwrite the program against the 2036 sunset and the risk of new litigation rather than assume a decade of steady drilling.

The county budget feels it too. KGET reported that oil and gas property values fell 12.32% on the 2025-26 roll and 64.37% since 2014. New wells add assessed value, which is why county officials framed the restart as a tax base issue. A 2021 industry-commissioned study estimated that oil and gas paid more than $197 million in Kern property taxes in fiscal 2018-19.

For landowners, SB 237 mainly changes timing and certainty. Surface owners with drill sites, roads or pads on their land, and mineral owners with leased acreage outside health protection zones, are the most likely to see activity. Land inside a zone sees little change. Buyers of oil-field land should also read our guide to idle oil wells in Kern County.

What could change SB 237 next?

Five things could shift the picture:

  • The 2036 sunset: the CEQA safe harbor ends Jan. 1, 2036 unless extended.
  • The 2,000-well cap: an Energy Commission finding under the 25% feedstock test would lift it.
  • SB 1137 litigation: if courts weakened the setback law, SB 237 would still bar approvals relying on the Kern review inside zones, but the state permitting picture would shift.
  • New CEQA challenges: No reported ruling has blocked the 2025 ordinance or SB 237, but Kern’s ordinance has drawn suits at every prior stage.
  • Energy Commission fuels recommendations: these could drive further legislation in 2027. Carbon capture is another policy track, covered in our Kern County carbon capture article.

Checklist for owners, operators and investors

  • Map any drilling or rework plan against the SB 1137 health protection zones first. SB 237 does not help inside a zone.
  • Landlords of service yards: use clauses, storage and hazardous materials terms, and term length relative to the 2036 sunset are the main lease issues.
  • Lenders and buyers: treat oil-dependent income as cyclical and policy-sensitive.

Illustrative example: which rules apply to four Kern well projects

Assume an operator plans four projects in western Kern County in 2026. The table shows how SB 237 and SB 1137 sort them. The scenarios are hypothetical and simplified.

ProjectLead agencyResult under SB 237 and SB 1137
New well 2 miles from the nearest homeKern CountyCan proceed under the county ordinance; CalGEM relies on the county EIR; counts toward the 2,000-well cap
New well 2,000 feet from a homeCalGEMBarred by SB 1137; SB 237 review cannot be used inside a zone
Rework of an existing well 1,500 feet from a schoolCalGEMGenerally barred by SB 1137 unless a health, safety or takings exception applies
Restart of an 8-inch oil pipeline idle for six yearsState Fire Marshal rulesNeeds spike hydrostatic testing at 139% of maximum operating pressure before restart

Frequently asked questions

What is SB 237?

SB 237 is a 2025 California law (Chapter 118, Statutes of 2025) that treats Kern County’s 2025 environmental review as sufficient for county-issued oil and gas permits until Jan. 1, 2036. It was signed Sept. 19, 2025, as part of an energy package. The bill also touches gasoline specifications, idle oil pipeline restarts, coastal oil transport and oil spill planning.

How many oil wells can Kern County permit under SB 237?

The law bars CalGEM from approving more than 2,000 notices of intention a year to drill new wells. Only a formal Energy Commission finding that more permits are needed to supply 25% of in-state refinery feedstock can lift that limit. County officials describe it as up to 2,000 permits a year.

When did Kern County start issuing oil permits again?

The county reopened its oil and gas permit portal on Jan. 2, 2026. That followed a court discharge of the writ in the long-running CEQA case in December 2025, and SB 237 took effect Jan. 1, 2026. County officials told 23ABC that more than 300 permits for new and existing wells were issued in the first month.

Does SB 237 override SB 1137 oil well setbacks?

No. SB 237 says no approval by Kern County or CalGEM may rely on the county’s environmental review for any operation in an SB 1137 health protection zone. That zone covers the area within 3,200 feet of homes, schools, health facilities and similar uses. CalGEM leads review for drilling or rework near those uses, and SB 1137’s ban on new permits there still applies.

Why were Kern County oil permits halted?

Courts found the environmental review behind Kern’s 2015 ordinance inadequate, first in King & Gardiner Farms v. County of Kern in 2020 and again in a March 7, 2024 Fifth District ruling. The 2024 decision cited cancer risk near sensitive receptors, water supply impacts and the removal of agricultural easement mitigation. County permitting stopped in early 2023 and resumed in January 2026.

When does SB 237 expire?

The Kern CEQA provisions in Public Resources Code Section 21080.81 stay in effect until Jan. 1, 2036, then are repealed unless the Legislature acts. Other parts of SB 237, such as the pipeline testing rules, are not tied to that date. Owners and lenders should keep 2036 in mind when underwriting oil-related leases or land deals.

Who supports and opposes SB 237?

Kern County supervisors, oil producers and the Western States Petroleum Association backed it as a way to steady in-state supply as refineries close. The Sierra Club, Earthjustice and Consumer Watchdog criticized it, arguing it fast-tracks drilling without site-specific review. Newsom signed it the same day he signed the cap-and-invest extension.

If the drilling restart has you looking for a service yard, shop or land near Kern’s oil fields, we can help you compare sites and lease terms. Call Kern CRE at 855-KERN-CRE (855-537-6273) or contact us. Get Kern County CRE news monthly: subscribe to the Kern CRE report.

Sources

  1. California SB 237 (2025): status, sponsors and history, LegiScan.
  2. SB 237 chaptered text (Chapter 118, Statutes of 2025), LegiScan, Sept. 19, 2025.
  3. Senate Bill 237, California Geologic Energy Management Division (CalGEM).
  4. California Enacts SB 237 to Streamline New Oil Well Permits in Kern County and Increase Output, Greenberg Traurig, Oct. 7, 2025.
  5. Has Gavin Newsom changed his tune on Big Oil? Some environmentalists say yes, CapRadio, Sept. 26, 2025.
  6. V Lions Farming LLC v. County of Kern, F084763 et al. (California Court of Appeal opinion), FindLaw, March 7, 2024.
  7. King & Gardiner Farms, LLC v. County of Kern (2020) 45 Cal.App.5th 814, vLex, 2020.
  8. Appeals court upholds oil permitting pause in California’s Kern County, ESG Dive, March 11, 2024.
  9. Appeals court orders halt to Kern oilfield permitting pending review, The Bakersfield Californian (headline only), January 2023.
  10. Kern County to resume oil and gas permits in 2026 after court decision, Bakersfield Now (KBAK), Dec. 7, 2025.
  11. Kern County to resume oil permits after long hiatus, faces challenges ahead, Bakersfield Now (KBAK), Dec. 11, 2025.
  12. Kern County resumes oil drilling permits after years-long pause, 23ABC News (KERO), Jan. 31, 2026.
  13. New California state law fuels a dramatic surge in Kern County oil drilling permits, leaders say, 23ABC News (KERO), Sept. 22, 2026.
  14. Oil Permits Surge In First Q 2026 With Majority For Dangerous Extraction Techniques, Consumer Watchdog (PR Newswire), May 27, 2026.
  15. Kern County discusses budget for fiscal year 2025-2026, KGET 17 News (via Yahoo News), 2025.
  16. The Economic Contribution of the Oil and Gas Industry in Kern County, Kern Economic Development Foundation (for WSPA), January 2021.
  17. Senate Bill 237 proceeding, California Energy Commission.
  18. Regional brokerage market reports (Bakersfield industrial, Q2 2026).
  19. Regional brokerage market reports (Bakersfield industrial, July 2026).
  20. SB 1137 Frequently Asked Questions, CalGEM.

About this article

Kern CRE prepared this article with help from AI research and writing tools. An editor reviewed the draft, checked its facts against the sources linked above and edited it for accuracy and clarity. It is general information, not legal, tax, investment or financial advice; talk with a qualified professional about your situation.

Get the Kern CRE Report

One email a month: the economic numbers that move commercial real estate, Kern County market statistics, and the deals and news shaping business here.

Free. Unsubscribe anytime.