Contracted farmland carries lower property taxes and a long exit. Here is how nonrenewal, cancellation, solar-use easements and the new AB 1156 work for Kern County buyers, sellers and developers.
Williamson Act Kern County contracts are 10-year, self-renewing agreements under California’s Land Conservation Act of 1965. They limit farmland to agricultural and compatible uses in exchange for lower, income-based property taxes. Leaving usually takes a nine-year nonrenewal or a cancellation with findings and a 12.5% fee. AB 1156, signed Sept. 30, 2026, adds a state-run fee deferral and waiver path for qualifying solar projects.
Williamson Act in Kern County at a glance
| Item | Detail |
|---|---|
| Law | California Land Conservation Act of 1965 (Williamson Act), Government Code section 51200 and following |
| Administered by | Kern County (and cities for land inside their limits), with oversight by the California Department of Conservation (DOC) |
| Contract term | 10-year rolling term for standard contracts; 20-year rolling term for Farmland Security Zones |
| Tax benefit | Land assessed on agricultural income instead of market value; Farmland Security Zone land at 65% of the lower value (Revenue and Taxation Code 423.4) |
| Ways out | Nonrenewal (9 years, or 19 for Farmland Security Zones), cancellation (findings plus 12.5% fee, 25% for Farmland Security Zones), solar-use easement rescission (6.25%), public acquisition |
| Kern value on roll | $5.87 billion of Williamson Act agricultural property for 2025-26, down $543.1 million from 2024 (Kern County Assessor, via Valley Ag Voice) |
| New law | AB 1156 (Wicks), signed Sept. 30, 2026: moves fee waivers and deferrals to the Natural Resources Secretary and adds a solar path |
| Status | Program active in Kern; state subventions to counties eliminated since fiscal year 2009-10 |
| What to watch | AB 1156 implementation, Kern Subbasin groundwater limits, county positions on solar conversions |
Key takeaways
- A standard contract runs on a 10-year rolling term, so a notice of nonrenewal starts a nine-year countdown before the land is free of the contract.
- Cancelling a contract requires specific findings by the Kern County Board of Supervisors and a fee equal to 12.5% of the land’s unrestricted value, or 25% for a Farmland Security Zone contract.
- Kern County’s Williamson Act agricultural property was valued at $5.87 billion on the 2025-26 roll, a $543.1 million drop from 2024, according to the county Assessor.
- AB 1156 shifts cancellation fee waivers and payment extensions from counties to the Secretary of the Natural Resources Agency and creates a path tied to photovoltaic solar facilities.
- Land in nonrenewal is reassessed upward every year under Revenue and Taxation Code section 426, so buyers should underwrite rising taxes, not today’s bill.
What is the Williamson Act and how does it work in Kern County?
The Williamson Act, formally the California Land Conservation Act of 1965, lets a county or city sign contracts with landowners that restrict land inside an agricultural preserve to farming and related open space uses. In return, the assessor values the land on what it can earn from agriculture instead of market value. In unincorporated Kern County the Board of Supervisors is the contracting party. Inside city limits, the city can be.
According to the Department of Conservation’s Williamson Act Q&A, standard contracts carry a 10-year rolling term and renew automatically each year on the anniversary date unless the land enters nonrenewal or cancellation. A 1989 study cited by DOC estimated the program saved landowners between 20% and 75% of their property tax bill each year.
Farmland Security Zone contracts, sometimes called super contracts, run on a 20-year rolling term. Under Revenue and Taxation Code section 423.4, Farmland Security Zone land is valued at 65% of the lower of its restricted value or its Proposition 13 value. That is a deeper tax cut in exchange for tighter restrictions and a higher exit cost.
The program is large in Kern. The county Assessor reported that Kern agricultural property under the Williamson Act was valued at $5.87 billion for 2025-26, a $543.1 million decrease from 2024, according to Valley Ag Voice on July 21, 2025. DOC notes that each city or county keeps current enrollment and contract details, so parcel-level questions go to Kern County Planning and the Assessor.
Standard contract vs. Farmland Security Zone
| Feature | Standard Williamson Act contract | Farmland Security Zone |
|---|---|---|
| Term | 10-year rolling, renews each year | 20-year rolling, renews each year |
| Assessment | Income-based restricted value (R&T 423) | 65% of the lower of restricted or Prop 13 value (R&T 423.4) |
| Nonrenewal countdown | 9 years | 19 years |
| Cancellation fee | 12.5% of cancellation valuation | 25% of cancellation valuation |
| Solar-use easement rescission fee | 6.25% of fair market value | 12.5% of fair market value |
How do you get land out of a Williamson Act contract?
There are five recognized exits, and each has a different clock and cost. DOC’s contract removal page lists nonrenewal, cancellation, a solar-use easement swap, an easement exchange, public acquisition by an agency with eminent domain power and, in narrow cases, a city’s refusal to succeed to a contract after annexation.
Nonrenewal: slow but predictable
Either the landowner or the county can serve a notice of nonrenewal. That starts a nine-year countdown for a standard contract and a 19-year countdown for a Farmland Security Zone contract. The land stays under every contract restriction until the end date.
Taxes rise during the wind-down. Under Revenue and Taxation Code section 426, the assessor adds back a discounted share of the gap between the restricted value and full value each year. The bill steps up annually instead of jumping at expiration.
Cancellation: faster, but findings and a fee
Cancellation ends a contract early, but the Board of Supervisors must make findings under Government Code section 51282 and the landowner pays a fee. Under Government Code section 51283, the fee equals 12.5% of the cancellation valuation. The county assessor sets that valuation as the land’s current fair market value as though it were free of the contract.
A recent Kern example shows the mechanics. A county staff report for the Nov. 7, 2023 Board of Supervisors meeting describes a request by Chalan CA Solar and Storage, LLC to cancel a contract on 618 acres in northwestern Kern near the Kings County line. The contract dated to 1970, a nonrenewal had been filed in 2023 with a 2032 expiration, and the applicant relied on the public-interest findings: that other public concerns substantially outweigh the Act’s objectives and that no nearby uncontracted land is available and suitable.
Solar-use easements: the SB 618 route
Senate Bill 618 (2011) created solar-use easements for land that DOC finds marginally productive or physically impaired. The landowner rescinds the contract and simultaneously signs an easement that limits the land to photovoltaic generation. The Assembly floor analysis of SB 618 set the rescission fee at 6.25% of the property’s nonrestricted value.
Under Government Code section 51191.2, the easement term is at least 20 years unless the landowner asks for a shorter term of at least 10 years. DOC says the option lapsed in 2020 and was reinstated in January 2023. A February 2025 DOC presentation adds that the program is a discretionary opt-in for each local government, that Farmland Security Zone land pays a 12.5% fee, that no part of the fee goes to the county, and that the landowner pays DOC a $7,100 consulting fee.
Annexation, public acquisition and breach
When a city annexes contracted land, it generally succeeds to the contract. DOC says the option to refuse succession under Government Code section 51243.5 applies only in very specific situations. Public acquisition removes a contract only for agencies with eminent domain authority. A material breach can bring termination of the noncompliant portion and a penalty of 25% of unrestricted fair market value.
What does AB 1156 change for Williamson Act land and solar?
AB 1156 moves the power to waive or defer cancellation fees from local governments to the state and opens a path for qualifying solar projects. Assemblymember Buffy Wicks’ bill was the most significant Williamson Act measure of the 2025-26 session. According to LegiScan’s bill history, the Senate passed the amended bill 21 to 14 on Aug. 31, 2026, and the Assembly concurred 56 to 6 the same day. The Governor’s office listed it as signed in its Sept. 30, 2026 legislative update. CalMatters Digital Democracy lists it as Chapter 875 of the Statutes of 2026. The bill amends Government Code sections 51283 and 51295.
Per the Legislative Counsel’s Digest as posted by CalMatters Digital Democracy, the bill removes a city’s or county’s ability to waive a cancellation fee or extend the time to pay it. The Secretary of the Natural Resources Agency does that instead, on the landowner’s application. Until Jan. 1, 2037, the Secretary must approve a completed application for a payment extension that includes required documentation showing either an involuntary transfer or land-use change or a qualifying photovoltaic solar facility. The Secretary must waive payment when the landowner shows solar construction is complete. The bill also deems a contract null and void when the land is approved for a photovoltaic solar facility certified under the Jobs and Economic Improvement Through Environmental Leadership Act of 2021.
Supporters framed the bill as an exit for farmland losing its water. pv magazine USA summarized it as making it financially feasible to convert distressed farmland to solar. The Rural County Representatives of California listed it as opposed in its Sept. 4, 2026 session wrap, and described it as waiving cancellation fees for solar land in critically overdrafted basins without regard to water availability.
Kern County was on record against the original version. The April 2025 Assembly Agriculture Committee analysis lists the County of Kern, American Farmland Trust, the California Farm Bureau Federation and the rural counties group in opposition. It lists solar developers, building trades and the Almond Alliance in support. The analysis also cites a Public Policy Institute of California estimate that, in a worst case, groundwater sustainability could require fallowing nearly 900,000 San Joaquin Valley acres.
How does the Williamson Act affect Kern County land today?
Water is now the main driver. Most of the valley floor sits in the critically overdrafted Kern Subbasin, where state groundwater law will limit pumping over time. The Kern County Assessor told Valley Ag Voice that land in districts served mainly by the Kern River held value better than land relying on the State Water Project, and that parcels with both district water and a private well tend to outsell those with only one.
Solar and storage are the most common reasons Kern contracts come up for removal, as the Chalan request shows. Wind is different. A Farella Braun + Martel analysis notes that counties such as Kern have found wind farms generally compatible with the Act, so wind leases often leave contracts in place. For a Kern solar example, see our report on the Discovery Solar project and the guide to the commercial solar tax credit.
Counties carry the cost. The Open Space Subvention Act once reimbursed them for lost tax revenue, but DOC says subvention payments have been eliminated since the 2009-10 state budget, after more than $863 million was paid from 1972 to 2010. DOC’s Multibenefit Land Repurposing Program funds conversion of farmland to lower water uses. It awarded $81.5 million in 2022, and the 2024 climate bond authorized up to $200 million more, with Round 3 guidelines expected in 2026. DOC’s awarded-projects page lists no Kern County or Kern Subbasin grantees.
What does Williamson Act status mean for buyers, investors and developers?
For a farmland buyer, a contract is usually a benefit: lower taxes and a restricted value that reflects farm income. The risk is underwriting the wrong tax bill. If the seller or the county has filed nonrenewal, taxes climb each year until expiration, and the restricted value disappears when the contract ends.
For an industrial or commercial developer, a contract is a schedule problem. An edge-of-town parcel with no nonrenewal notice on file today is effectively unavailable for industrial use until the mid-2030s unless the Board approves a cancellation. That adds a fee based on unrestricted value, a public hearing and findings that can be challenged. Many industrial buyers simply avoid contracted land. Our guides to industrial land entitlements and CEQA and to McFarland Annexation 22 show how land already prezoned for industry avoids that problem.
For solar and storage developers and their landlords, AB 1156 may shorten that timeline on qualifying projects, but eligibility and the Secretary’s review will matter. Lenders and title insurers will want recorded evidence that a contract was cancelled, rescinded or expired before they treat the land as unrestricted.
Comparing the main exit paths (standard contract)
| Path | Typical time | Cost to landowner | Who decides |
|---|---|---|---|
| Nonrenewal | 9 years | No fee; taxes phase up yearly | Landowner or county files notice |
| Cancellation | Months, after a public hearing | 12.5% of unrestricted value | Board of Supervisors (or city council), with findings |
| Solar-use easement | Months, if the county opted in | 6.25% of fair market value plus DOC fee | County, with DOC eligibility determination |
| AB 1156 solar path | New; guidance pending | Fee deferral or waiver by the state | Secretary of the Natural Resources Agency |
What should a buyer check before buying Williamson Act land in Kern County?
Start with title and the Assessor, then confirm water and the exit path. Use the list below alongside our due diligence checklist for industrial buyers.
- Order a preliminary title report and look for a recorded Williamson Act or Farmland Security Zone contract, any recorded notice of nonrenewal and any certificate of cancellation.
- Ask the Kern County Assessor for the restricted value, the Prop 13 value and the projected values if nonrenewal is filed, then model taxes for every year of your hold.
- Read Kern County’s Uniform Rules for the preserve: minimum parcel size, compatible uses, and limits on homes, processing and solar.
- Confirm the water story: district service area, well records and the groundwater sustainability agency’s pumping allocations.
- For a planned conversion, get a written path from Kern County Planning: nonrenewal timing, cancellation findings, solar-use easement eligibility or AB 1156 eligibility.
- Check whether the land is inside a city’s sphere of influence. Annexation does not automatically end a contract.
What should Kern County landowners watch next?
Three things will shape the next year. First, the Natural Resources Agency has to set up AB 1156: application forms, what proof a landowner must give and how it coordinates with Kern County. Second, Kern Subbasin groundwater limits drive solar conversion requests, because water shortfalls push owners to leave farming. Third, Kern County’s own policy on solar-use easements and cancellations matters. The county opposed AB 1156 as introduced and still controls zoning and conditional use permits for solar projects.
One recorded document can change a parcel’s value by six figures, so have a land use attorney confirm the contract terms and exit options for any specific parcel.
Illustrative example: exit costs on a 160-acre Kern parcel
Assume, for illustration only, a 160-acre parcel under a standard contract that the assessor values at $15,000 per acre as if unrestricted, or $2.4 million. A cancellation fee at 12.5% would be $300,000. If the same land were in a Farmland Security Zone, the 25% fee would be $600,000. A solar-use easement rescission at 6.25% would cost $150,000, plus DOC’s consulting fee.
Taxes tell the other half of the story. Suppose the restricted value is $640,000 and the unrestricted value is $2.4 million. At an illustrative 1.1% rate, the bill would be roughly $7,040 a year under contract versus $26,400 unrestricted. In nonrenewal, the bill would step up each year between those two figures. Actual values come from the Kern County Assessor, and tax rates vary by tax rate area.
| Path | Rate | Illustrative cost |
|---|---|---|
| Cancellation, standard contract | 12.5% | $300,000 |
| Cancellation, Farmland Security Zone | 25% | $600,000 |
| Solar-use easement rescission | 6.25% | $150,000 plus $7,100 DOC fee |
| Nonrenewal | None | $0 fee; 9-year wait and rising taxes |
Frequently asked questions
How do I know if land in Kern County is under a Williamson Act contract?
A recorded contract or notice of nonrenewal shows up on the preliminary title report, and the Kern County Assessor’s records show whether the parcel is assessed at a restricted value. DOC says the city or county holds enrollment and contract details, so Kern County Planning’s contract files and preserve maps are the authoritative source.
How long does Williamson Act nonrenewal take?
Nine years for a standard contract and 19 years for a Farmland Security Zone contract, according to DOC. The land stays under all contract restrictions during that time. Property taxes rise each year under Revenue and Taxation Code section 426 until the contract expires and the restricted assessment ends.
What is the Williamson Act cancellation fee?
It is 12.5% of the cancellation valuation under Government Code section 51283. The county assessor sets that valuation as the land’s fair market value as if it were free of the contract. Farmland Security Zone contracts carry a 25% fee. The Board of Supervisors must also make findings at a public hearing before approving a cancellation.
Can I put solar panels on Williamson Act land in Kern County?
Possibly, but not as a routine use. Options include an SB 618 solar-use easement on land DOC finds marginally productive or physically impaired, a cancellation with findings and a fee, waiting out nonrenewal, or the new AB 1156 path for qualifying photovoltaic projects. Kern County must also approve the solar project through its own zoning and permit process.
What does AB 1156 do?
AB 1156 (Wicks), signed Sept. 30, 2026, amends Government Code sections 51283 and 51295. It moves authority to waive or defer cancellation fees from counties to the Natural Resources Secretary and requires approval of qualifying payment extensions through Jan. 1, 2037. It also voids contracts on land approved for certain certified photovoltaic solar facilities. Implementation details are still emerging.
Does annexation into a city end a Williamson Act contract?
Generally no. A city that annexes contracted land usually takes over the county’s rights and duties under the contract. DOC says the option to refuse succession under section 51243.5 applies only in very specific situations.
If you are weighing farmland, edge-of-town industrial ground or a solar lease in Kern County, call Kern CRE at 855-KERN-CRE (855-537-6273) or contact us to sort out contract status, timelines and comparable land values before you commit. Get Kern County CRE news monthly: subscribe to the Kern CRE report.
Sources
- Land Conservation (Williamson) Act: Questions and Answers, California Department of Conservation.
- Williamson Act: Removing Contracts, California Department of Conservation.
- Williamson Act Reports and Statistics, California Department of Conservation.
- Solar Use and Williamson Act Contracts (presentation), California Department of Conservation, Feb. 13, 2025.
- Open Space Subvention Act, California Department of Conservation.
- Multibenefit Land Repurposing Program, California Department of Conservation.
- Government Code section 51283 (cancellation fee), Justia (California Code), 2025.
- Government Code section 51191.2 (solar-use easement term), Justia (California Code), 2025.
- Revenue and Taxation Code section 426 (valuation during nonrenewal), Justia (California Code), 2025.
- Revenue and Taxation Code section 423.4 (Farmland Security Zone valuation), Justia (California Code), 2025.
- SB 618 (Wolk) bill analysis, California Assembly Floor, Aug. 31, 2011.
- AB 1156 (Wicks) bill analysis, hearing of April 30, 2025, California Assembly Committee on Agriculture, April 2025.
- California AB 1156 (2025-2026) bill history and votes, LegiScan.
- AB 1156: Williamson Act contracts: cancellation fees: photovoltaic solar facilities, CalMatters Digital Democracy.
- Governor Newsom issues legislative update 9.30.2026, Office of Governor Gavin Newsom, Sept. 30, 2026.
- State Senate and Assembly Conclude the 2025-26 Legislative Session, Rural County Representatives of California, Sept. 4, 2026.
- How California’s latest climate and energy bills reshape the grid, pv magazine USA, Oct. 2, 2026.
- Board of Supervisors staff report: Request of Chalan CA Solar and Storage, LLC (Williamson Act contract cancellation), Kern County Planning and Natural Resources Department, Nov. 7, 2023.
- Ag Property Values Slip in Kern Despite $3.2 Billion Increase Countywide, Valley Ag Voice (Natalie Willis), July 21, 2025.
- The Challenges of Developing Utility-Scale Renewable Energy Projects on Land Under Williamson Act Contracts, Farella Braun + Martel, Jan. 14, 2019.
About this article
Kern CRE prepared this article with help from AI research and writing tools. An editor reviewed the draft, checked its facts against the sources linked above and edited it for accuracy and clarity. It is general information, not legal, tax, investment or financial advice; talk with a qualified professional about your situation.